Published 2 November 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty
What's Your Unit Worth Right Now?
Get a free AI-powered price range for your condo in under 90 seconds — floor, exposure, view, parking and locker included. No name or address required.
Get My Free Estimate →
Georgetown has few pre-construction homes on sale for 2027: McGibbon on Main, a 169-suite condo, is under construction, while larger proposals near the GO station and in southeast Georgetown are still in approvals. Builders do not publish prices publicly, so ask for price lists. Resale benchmarks: detached $1,000,000 and freehold townhouses $817,500 (January to October 2026).
This guide is for buyers looking at a new home or condo from a builder in Georgetown, Glen Williams or elsewhere in Halton Hills for 2027. You will see which projects are building or moving through approvals, how new prices line up against resale, what deposits and extra costs to expect, and who each option suits, as of November 2026.
What pre-construction is available in Georgetown right now?
Less than in Milton or Oakville. Halton Hills has a small number of active new-home sites at any one time, and most of the big pipeline is still in approvals. McGibbon on Main, a 10-storey condo, is under construction downtown. Several large proposals around the GO station and in southeast Georgetown are before the Ontario Land Tribunal (OLT). The largest future supply, Vision Georgetown, has an approved plan but is still years from full build-out.
That means two things for you. First, choice is limited in 2027, so the right home may be a resale one. Second, builders who are selling today often release lots or suites in small phases, so price lists change often and are not always posted publicly.
Which Georgetown and Halton Hills projects should you know about?
These are the projects I could confirm from Town of Halton Hills planning pages and UrbanToronto. Statuses are as listed on those pages in November 2026. None of the sources publishes a price or deposit structure, so I show “price list available on request” for each.
| Project | Builder or applicant | Home types | Price from | Deposit | Est. occupancy | Status |
|---|---|---|---|---|---|---|
| McGibbon on Main, 79 Main St S | Amico Infrastructures | 10-storey condo, 169 suites, retail at grade | Price list available on request | Not published | Not published | Under construction |
| 1 Rosetta St and 6 & 8 Saint Michaels St | 1 Rosetta Street Inc. | Condo apartments, 637 units in one 8-storey and two 12-storey buildings | Not yet selling | Not published | Not set | In review; third submission October 2024 |
| 130 Mountainview Rd N | Gilbach Georgetown Inc. | 1,481 units in six towers of 17 to 22 storeys; tenure not stated | Not yet selling | Not published | Not set | Appealed to the OLT, September 2025 |
| 16469 10 Side Road, Southeast Georgetown | Russell Pines Property Corp. | 274 detached homes and 470 townhouses (street, back-to-back and dual-frontage) | Not yet selling | Not published | Not set | Appealed to the OLT, November 2025 |
| 159 Confederation St, Glen Williams | Eden Oak (Bayfield) Inc. | 81 two-storey townhouses and 1 detached home on a private road | Not yet selling | Not published | Not set | Appealed to the OLT, May 2025 |
| Vision Georgetown subdivisions | Several landowners | About 9,342 planned homes: detached, townhouses and apartments | Price list available on request as phases release | Varies by builder | Phased over many years | Secondary plan approved; modified by the OLT in 2023 |
Source: Town of Halton Hills development application pages and Vision Georgetown Secondary Plan (OPA 32); UrbanToronto project database. Checked November 2026. Occupancy dates are never promised; any date a builder gives is targeted.
A project in front of the OLT can still be approved, changed or refused, and it usually needs a zoning decision, a draft plan and a site plan before any sales start. Treat those rows as a look at what is coming, not homes you can buy this winter.
Where is the growth in Halton Hills happening?
Vision Georgetown
Vision Georgetown is the town’s plan for a new community of about 412 hectares in southwest Georgetown, bounded by 15 Side Road, Trafalgar Road, 10 Side Road and Eighth Line. The approved secondary plan targets about 23,800 residents, 2,400 jobs and 9,342 homes. Only about 2,287 of those are low-density houses. About 4,012 are medium-density homes such as townhouses, and about 3,043 are apartments. So most new homes here will be attached, which is good news for buyers under $1 million.
The GO station and downtown
The Rosetta Street and Mountainview Road proposals both sit near Georgetown GO Station, on the GO Kitchener line. Metrolinx is turning that line into two-way, all-day service, with 15-minute service as the goal, but it says new trips will be added in stages as each piece of work is finished. It has not published a finish date, so do not pay a premium today for train service that is not running yet.
Southeast Georgetown and Glen Williams
The 10 Side Road plan would add a mix of detached homes and townhouses, two parks and a commercial block in southeast Georgetown. Glen Williams, the historic hamlet north of town, is seeing small infill proposals such as the townhouses at 159 Confederation Street. I cover what each area is like in my guide to the best neighbourhoods in Halton Hills.
If you want the current price lists, floor plans and incentives for Georgetown and Halton Hills, send me a note below and I will send what I have.
Get the price list and floor plans
Tell me which project or area you are looking at. I will send the current price list, available floor plans, the deposit structure and the incentives on offer, plus my honest read on whether it is worth it.
I will send what I have on it personally, usually the same day.
How do new home prices in Georgetown compare with resale?
Resale prices give you a yardstick for any builder price list. These are town-wide resale medians for Halton Hills, not new-home prices.
| Home type (resale) | Median price, Jan–Oct 2026 | Change vs 2025 | Sales | Avg. days on market |
|---|---|---|---|---|
| Detached | $1,000,000 | -8.3% | 389 | 29 |
| Semi-detached | $827,500 | +1.5% | 19 | 20 |
| Freehold townhouse | $817,500 | -6.6% | 54 | 27 |
| Condo townhouse | $580,000 | -3.7% | 39 | 27 |
| Condo apartment | $570,000 | -2.6% | 19 | 36 |
Source: TRREB MLS data via REALM, January–October 2026 vs the same period of 2025. Resale, town-wide medians for Halton Hills.
Only 19 condo apartments and 19 semis sold in ten months, so those medians can swing a lot. When you compare, add closing adjustments and any HST the builder has not included, then subtract the rebates you qualify for. A new home should earn its premium with a warranty, newer systems and a layout you cannot find in resale. For the full resale picture, see my Halton Hills housing market 2027 report.
How much deposit do you need for a new home in Georgetown?
Each builder sets its own deposit schedule in the agreement of purchase and sale, usually as several payments spread over months. None of the Georgetown projects above has a deposit structure on a public, non-builder source, so ask for it in writing before you visit a sales office. My pre-construction deposit calculator shows what each payment adds up to and when it is due.
- Condo apartments and condo towns: the Condominium Act requires deposits to be held in trust, and Tarion protects up to $20,000.
- Freehold detached and townhouses: Tarion protects up to $60,000 on homes priced at $600,000 or less, and 10% of the price up to $100,000 above that. Register your purchase with Tarion within 45 days of signing. My guide to Tarion deposit protection on freehold homes explains why that step matters.
- Your down payment: deposits count toward it at closing. The minimum in Canada is 5% of the first $500,000 and 10% of the rest up to $1.5 million.
What costs come on top of the price of a new Georgetown home?
The sticker price is not the closing price. Plan for these:
- Closing adjustments: utility hookups, Tarion enrolment and other charges. HCRA says every extra charge the builder plans to add must be listed in Schedule B, and you can ask for a cap.
- Development charges: these are usually built into the price, but check whether the agreement lets the builder pass on any increase.
- Land transfer tax: Ontario’s tax applies, and first-time buyers can get a refund of up to $4,000. Toronto’s extra municipal tax applies only inside the City of Toronto.
- Interim occupancy for condos: you may pay a monthly occupancy fee before the building registers. See my guide to interim occupancy in Ontario.
Do the 2027 HST rebates apply to new homes in Halton Hills?
Yes, subject to eligibility. Under CRA Notice 346, Ontario’s enhanced rebate applies to agreements signed with a builder from 1 April 2026 to 31 March 2027. It refunds the full 8% Ontario part of HST on homes up to $1 million (to $80,000), a flat $80,000 up to $1.5 million, and a partial amount up to $1.85 million. Ontario’s New Home Affordability Payment can cover up to $50,000 of the 5% federal part, for up to $130,000 in total. The home must be your primary residence or a relation’s.
Eligible first-time buyers may also qualify for the federal First-Time Home Buyers’ GST Rebate on new homes up to $1.5 million. Ask your lawyer how the programs combine for your contract. More detail is in my post on the Ontario HST rebate of up to $130,000.
Freehold buyers in Ontario do not get a 10-day cooling-off period yet. Tarion says it starts on 1 January 2028, so a Georgetown freehold agreement signed in 2027 is binding once you sign, subject only to any conditions written into it. Have a lawyer review the agreement first. Read the Statement of Critical Dates too, because occupancy can be pushed back within the limits it sets.
Who should buy pre-construction in Georgetown?
- First-time buyers under $1 million: townhouses and condos are where most new supply is planned, and the HST relief is largest under $1 million. Sign by 31 March 2027 if you want the enhanced rebate.
- Families: new freehold townhouses and detached homes in southeast Georgetown and, later, Vision Georgetown will suit buyers who can wait for a closing date a few years out.
- Investors: be careful. Only 19 condo apartments resold in ten months of 2026, so the condo market is thin, and resale condos sat for 36 days on average.
- Downsizers: a downtown condo near Main Street and the GO station suits owners who want to stay in town without stairs or a yard.
Georgetown is a slow-build market. In my view, the best new-home value in 2027 will come from townhouses priced under $1 million, signed before the rebate window closes on 31 March 2027, from a builder with a strong HCRA record. If nothing fits yet, a resale townhouse at the $817,500 median is a fair benchmark, and you can buy now instead of waiting for approvals that may take years. That is my opinion, not a forecast.
What to do next
- Decide your budget after HST relief, closing adjustments and land transfer tax.
- Ask for the deposit schedule and Schedule B in writing, then run them through the deposit calculator.
- Check the builder on HCRA’s Ontario Builder Directory and read my check before you sign list.
- Compare each price list with the resale medians above and with my Georgetown home value guide if you are selling first.
- Have a real estate lawyer review the agreement before you sign.
When you are ready to compare real price lists, use the form above and I will send what I have for Georgetown and Halton Hills.
Need help with this? Talk to me.
I’m Jatin Dua, Broker of Record at RE/MAX Quantum Realty, and I’m the best agent to do this kind of work for you in Toronto and across the GTA. Over $100 million in GTA sales and 100+ families helped sell. Feel free to contact me any time: call or text 833-330-1925 or email [email protected].
Frequently asked questions
Are there pre-construction homes in Georgetown in 2027?
Yes, but only a few. McGibbon on Main, a 10-storey, 169-suite condo on Main Street South, is under construction, and larger proposals at 1 Rosetta Street, 130 Mountainview Road North and 16469 10 Side Road are still in approvals as of November 2026. Vision Georgetown will add about 9,342 homes over many years. Ask for current price lists, because phases release in small batches.
How much is a new house in Georgetown, Ontario?
No public, non-builder source lists Georgetown new-home prices, so ask each builder for its current price list. As a yardstick, resale detached homes in Halton Hills sold for a median of $1,000,000 from January to October 2026, down 8.3% from 2025, and freehold townhouses for $817,500, according to TRREB MLS data via REALM.
What is Vision Georgetown?
Vision Georgetown is the Town of Halton Hills plan for a new community of about 412 hectares in southwest Georgetown, between Trafalgar Road and Eighth Line. The approved secondary plan targets about 9,342 homes, 23,800 residents and 2,400 jobs. Roughly three quarters of the homes are planned as townhouses and apartments, with the rest as detached houses.
Are there new condos in Georgetown?
Yes. McGibbon on Main at 79 Main Street South is a 10-storey condo with 169 suites, built behind the restored 1890s facades of the old McGibbon Hotel, and it is under construction. A 637-unit condo proposal at 1 Rosetta Street near the GO station is still in review. Halton Hills condo apartment resales had a median of $570,000 in 2026.
How much deposit do I need for a pre-construction home in Halton Hills?
It depends on the builder, because each one sets its own deposit schedule in the purchase agreement. None of the Georgetown projects publishes its structure on a public, non-builder source, so get it in writing. Tarion protects up to $20,000 on a condo and up to $100,000 on a freehold home, and deposits count toward your down payment.
Do HST rebates apply to new homes in Georgetown in 2027?
Yes, subject to eligibility. Agreements signed with a builder from 1 April 2026 to 31 March 2027 can get the full 8% Ontario part of HST back on homes up to $1 million, plus up to $50,000 toward the federal part, for up to $130,000 in total. The home must be your primary residence or a relation’s, so confirm with your lawyer.
Is there a cooling-off period on new freehold homes in Georgetown?
Not in 2027. Tarion says the new 10-day cooling-off period for freehold homes starts on 1 January 2028. Condo buyers in Georgetown already have a 10-day period under the Condominium Act. If you are buying a freehold townhouse or detached home in 2027, have a lawyer review the agreement before you sign, not after.
Is Georgetown a good place to buy a new home for a GO commuter?
It can be. Georgetown GO Station is on the GO Kitchener line, and Metrolinx is working toward two-way, all-day service with 15-minute trains as the goal. Metrolinx says service will be added in stages and has not given a finish date, so check today’s timetable against your work hours before you pay more to be near the station.
Should I buy new or resale in Halton Hills in 2027?
Buy new if you can sign by 31 March 2027, qualify for the HST relief and are happy to wait for closing. Buy resale if you need a home soon, since most large Georgetown projects are still in approvals. Resale medians in 2026 were $1,000,000 for detached homes and $817,500 for freehold townhouses, per TRREB MLS data via REALM.
Sources
- Town of Halton Hills: Vision Georgetown Secondary Plan (OPA 32)
- Town of Halton Hills: 1 Rosetta Street and 6 & 8 Saint Michaels Street application
- Town of Halton Hills: 130 Mountainview Road North development proposal
- Town of Halton Hills: 16469 10 Side Road application
- Town of Halton Hills: 159 Confederation Street application
- UrbanToronto: McGibbon on Main project database
- Metrolinx: Kitchener Line GO Expansion
- CRA Notice 346: Ontario enhanced new housing rebate
Related reading
- Pre-Construction Homes and Condos in Oakville (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Mississauga (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Brampton (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Milton (2027): Projects, Prices and Deposits
About the author — Jatin Dua, Toronto and GTA real estate broker
I am Jatin Dua, Broker of Record and co-founder of RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway, Toronto. I work with buyers and sellers across Toronto and the GTA and have helped more than 100 families sell. Four-plus years of active GTA transactions and over $100 million in sales volume.
Reach me at [email protected] or 833-330-1925, or book a call.
More from the library
- Pre-Construction Homes and Condos in Richmond Hill (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Kitchener, Waterloo and Cambridge (2027): Projects, Prices and Deposits
- Bolton Place at Caledon Station Review (2027): Prices, Deposit Structure, Pros and Cons
- West Toronto vs North Toronto Luxury: Two Different Kinds of Money
- Mississauga City Centre Condo Buildings: A 2027 Guide to Six Well-Known Towers Around Square One
- Market Square I, 35 Church St: Big Suites Around a Courtyard Garden
