Published 2 November 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty
What's Your Home Worth Right Now?
Get a free AI-powered price range for your property in under 90 seconds, based on recent GTA comparable sales. No name or address required.
Get My Free Estimate →
Aquanova at Lakeview Village is a 416-unit condo by the Greenpark group in Mississauga’s new waterfront community, listed as an active project on the HCRA record in November 2026. No public non-builder source lists its prices or deposit schedule, so ask for the current price list. Resale condo apartments in Mississauga had a median of $485,000 in January to October 2026.
This review is for buyers who have seen Aquanova at Lakeview Village advertised and want a straight answer before they sign. You will get what the public record says about the project and its builder, how to judge the price and deposit, when it might be finished, and how it compares with resale condos nearby, as of November 2026.
What is Aquanova at Lakeview Village, and where is it?
Aquanova is a condominium project inside Lakeview Village, the new community being built on the old Lakeview Power Generating Station lands in east Mississauga. The whole site is 177 acres on the lake, right where Mississauga meets Etobicoke. The City says the plan includes more than 45 acres of parkland in six parks, a long public pier and about 1.5 million square feet of job space.
The provincial home-builder regulator, the HCRA, lists Aquanova Condos as a 416-unit condominium project at 950 Aerodrome Avenue, a new street inside the community. Its status on that record is “In Progress,” and the builder is marketing suites to buyers. You can see the details I track on my Aquanova project page.
Who owns Lakeview Village?
Lakeview Community Partners Limited bought the land from Ontario Power Generation in 2017. The City lists the partners as TACC Construction, Greenpark Group, CCI Development Group, Branthaven and Argo Development. Each partner builds its own blocks. The first residential building, Harbourwalk by Tridel, started construction on 7 October 2024. For the full picture of the plan, read my guide to what is actually being built at Lakeview Village.
Who is building Aquanova, and what is the builder’s track record?
The vendor company on the HCRA record is Baldanine Development Corp., which sits in the Greenpark Homes group of related companies. Greenpark is one of the Lakeview Village partners. Builders in Ontario often use a separate company for each project, so the name on your agreement may not be the brand name on the sign. That is normal, but you should know which company you are signing with.
The HCRA Ontario Builder Directory shows a long list of finished Greenpark condo projects. They include Axiom in Toronto (completed 2019), 330 Richmond in Toronto (2021), Charisma Condominiums in Vaughan (2023), Dun West in Oakville (2023), The Post in Oakville (2025), Charisma 2 (2025) and The 5th at Charisma (2026). The group summary shows one chargeable conciliation. That is a case where Tarion found a warranted defect the builder did not fix in time.
A long finished-project list does not guarantee a smooth closing, but it is a far better starting point than a first-time builder. If you want to run the same check yourself, my twenty-minute builder check shows where to look.
How much does Aquanova cost in 2027?
I could not find Aquanova prices on any public source that is not the builder or a brokerage sales page. Listing sites show ranges, but they are often months old and I do not repeat numbers I cannot check. The honest answer is that the price list is available on request, and it changes by floor, view and release.
Here is what the public record does say about pricing nearby and in the market:
- In September 2026, The Pointer reported a 599 square foot suite at Tridel’s Harbourwalk, also in Lakeview Village, listed at $787,000, and a 1,621 square foot suite at $2,525,000. That is a different building, but it shows where new waterfront product in this community has been priced.
- Urbanation reported that the average asking price for new condos across the Greater Toronto and Hamilton Area was $1,157 per square foot in Q3 2026, down 4% in a year and 20% below the 2023 peak.
- Only 760 new condos sold across that region in Q3 2026, which is 78% below the 10-year average for the quarter. Builders are working harder for every sale, which gives buyers more room to ask for better terms.
Can the HST rebates lower the price?
Possibly. CRA Notice 346 says Ontario’s enhanced new housing rebate covers agreements signed from 1 April 2026 to 31 March 2027, for a home that will be the buyer’s (or a relative’s) primary residence. It refunds the full 8% Ontario part of the HST up to $80,000 on homes up to $1 million. Ontario’s New Home Affordability Payment can add up to $50,000 toward the federal part. First-time buyers may also qualify for the federal First-Time Home Buyers’ GST Rebate on new homes up to $1 million, phasing out at $1.5 million. All of this is subject to eligibility, and investors who plan to rent the unit out do not get the owner-occupier rebate. Ask whether the builder’s price assumes you are assigning a rebate to them, and confirm with your lawyer.
What is the Aquanova deposit structure?
The deposit schedule comes with the price list, and I could not find it on a public non-builder source. So instead of guessing, here is how to judge whatever schedule you are offered:
- Add it up. Total the deposits and the dates they are due, then check that you can pay each one from savings without stretching. My pre-construction deposit calculator does the maths for you.
- Know the protection. Tarion protects condo deposits up to $20,000. Condo deposits must also be held in trust under the Condominium Act. Ask how deposits above the Tarion limit are secured.
- Ask for an extended schedule. In a slow market, spreading payments out is a common request. Get any change in writing in the agreement.
If you want the current Aquanova price list, floor plans, deposit schedule and incentives, send me a note below and I will send what I have.
Get the price list and floor plans
Tell me which project or area you are looking at. I will send the current price list, available floor plans, the deposit structure and the incentives on offer, plus my honest read on whether it is worth it.
I will send what I have on it personally, usually the same day.
When will Aquanova be finished?
There is no occupancy date for Aquanova on a public non-builder source, so treat any date you are told as targeted, not promised. The wider timeline gives some guidance. The Pointer reported in September 2026 that the first homes in Lakeview Village are slated for 2028. The City says the district energy system run by Enwave will start up when the first buildings open in early 2029. Full build-out is expected to take about 15 years.
Your agreement will list a first tentative occupancy date and the rules for moving it. Tarion sets limits on how far a builder can extend and when you get compensation. For condos, there is usually an interim occupancy period, when you live in the unit and pay a monthly fee before the building is registered and you get title. My guide to interim occupancy fees and the appraisal gap explains what that costs.
What changes for condo agreements in 2027?
Tarion says that from 1 January 2027, vendors must attach updated addenda and a condominium information sheet to new home purchase agreements. If you sign in 2027, check that those documents are in your package.
How do Aquanova prices compare with resale condos nearby?
Lakeview Village sits on the Mississauga side of the city line, with Etobicoke’s lakeshore (Long Branch, New Toronto and Mimico) just to the east. Resale prices give you a reality check against any pre-construction price list. These are medians for the whole city or district, not for Lakeview.
| Area and type (resale) | Median Jan–Oct 2026 | Median Jan–Oct 2025 | Change | Avg days on market 2026 |
|---|---|---|---|---|
| Mississauga condo apartment | $485,000 | $535,000 | -9.3% | 42 |
| Mississauga condo townhouse | $689,300 | $750,000 | -8.1% | 37 |
| Toronto W06 condo apartment | $607,500 | $624,500 | -2.7% | 40 |
| Toronto W06 condo townhouse | $765,000 | $820,000 | -6.7% | 35 |
Source: TRREB MLS data via REALM, January–October 2026 vs the same period of 2025. Resale medians for the whole municipality or district. W06 covers Alderwood, Long Branch, Mimico and New Toronto in Etobicoke.
The point is simple. If a new suite costs well above what a similar resale unit sells for today, you are paying for newness, the waterfront and the future of the community. That can be worth it, but the gap has to close by the time you finish, or the lender’s appraisal may come in short.
What are the pros and cons of Aquanova at Lakeview Village?
Pros
- A new address in a large waterfront community with planned parks, a pier, trails and job space, rather than a lone tower on a busy road.
- A builder group with many finished condo projects on the HCRA record.
- Buyers have leverage in this market. New condo sales are far below normal, so incentives and better deposit terms are easier to ask for.
- If you qualify, the 2026–27 HST rebates can cut the true cost of a home you will live in.
Cons
- The community will be a construction site for years. The City now projects about 12,000 homes, and a 2023 Minister’s Zoning Order allows up to 16,000.
- Later phases will compete with you when you want to sell or rent.
- Some promised amenities still depend on funding. The Pointer reported the pier budget at $120 million, with part of the public share not yet confirmed.
- Public transit is still mostly buses for now. A Lakeshore bus rapid transit project is planned, but you are not buying next to a subway.
Who should buy Aquanova, and who should skip it?
It may suit you if you plan to live there for many years, you want to be near the lake and parks, you can carry the deposits from savings, and you are comfortable owning in a place that will keep changing for a decade or more. Downsizers from east Mississauga and south Etobicoke may like staying close to the water in a newer building.
Skip it if you need to sell or assign within a few years, you are counting on rent to cover the carrying costs, or you would struggle if the unit appraised below your price at closing. Investors should know that thousands of new units are planned around this building over the next 15 years.
Lakeview Village is one of the few places in the GTA where you can buy new on the lake inside a planned community, and the builder group has a real record. But I would only buy here as an end user with a long horizon. Ask for a lake-facing or park-facing suite, push for capped development charges and a longer deposit schedule, and compare the price per square foot with Mississauga resale before you sign.
What risks come with buying Aquanova pre-construction?
Every pre-construction condo carries the same four risks. They are not unique to Aquanova, but you should plan for each one.
- Delays. Large sites with shared roads, servicing and district energy have many moving parts. Your occupancy date can move.
- Interim occupancy. You pay a monthly occupancy fee before you own the unit. It is not rent toward your price.
- Appraisal gap. Lenders lend on the appraised value at closing. If resale prices are lower than your contract price, you cover the difference in cash.
- Assignment limits. Builders often charge a fee or limit assignments, and selling one in a slow market is hard. Read my guide to selling an assignment in the GTA before you rely on that exit.
Ontario condo buyers have 10 days to cancel after receiving the signed agreement and the disclosure statement, under section 73 of the Condominium Act. Use that time to have a real estate lawyer read the agreement, the occupancy terms and the cap on development charges. After those 10 days, walking away usually means losing your deposit.
What to do next
- Get the current price list, floor plans and deposit schedule, and note the date on them.
- Compare the price per square foot with the Mississauga resale medians above and with other Lakeview Village releases.
- Check the vendor company in the HCRA Ontario Builder Directory and read the warranty history.
- Model the deposits, closing costs and interim occupancy fees, and ask your lawyer whether you qualify for the HST rebates.
- Use the 10-day cooling-off period to have a lawyer review the agreement before it becomes final.
When you are ready, use the form above, or visit the Aquanova project page, and I will send the latest numbers. I also cover every project in the area in my Mississauga pre-construction guide for 2027.
Need help with this? Talk to me.
I’m Jatin Dua, Broker of Record at RE/MAX Quantum Realty, and I’m the best agent to do this kind of work for you in Toronto and across the GTA. Over $100 million in GTA sales and 100+ families helped sell. Feel free to contact me any time: call or text 833-330-1925 or email [email protected].
Frequently asked questions
How much is a condo at Aquanova at Lakeview Village?
There is no public non-builder source for Aquanova prices as of November 2026, so ask for the current price list. For context, The Pointer reported in September 2026 that a 599 sq ft suite at Harbourwalk, another Lakeview Village building, was listed at $787,000. Resale condo apartments in Mississauga had a median of $485,000 from January to October 2026, per TRREB data via REALM.
Who is the builder of Aquanova at Lakeview Village?
Aquanova is built by the Greenpark group. The HCRA Ontario Builder Directory lists the vendor as Baldanine Development Corp., part of the Greenpark Homes related companies, with a 416-unit project at 950 Aerodrome Avenue in Mississauga. Greenpark is also one of the partners in Lakeview Community Partners, which bought the Lakeview Village lands in 2017.
How much deposit do I need for Aquanova at Lakeview Village?
The Aquanova deposit schedule is not published on any public non-builder source, so it comes with the price list. Whatever the schedule, Tarion protects condo deposits up to $20,000 and the Condominium Act requires condo deposits to be held in trust. In 2026 and 2027 many buyers ask builders to spread deposits over a longer period, so it is worth asking.
When is Aquanova at Lakeview Village occupancy?
No occupancy date for Aquanova appears on a public non-builder source as of November 2026, so treat any date as targeted. The Pointer reported that the first homes in Lakeview Village are slated for 2028, and the City of Mississauga says district energy will start when the first buildings open in early 2029. Your agreement will show the tentative occupancy date and the extension rules.
Where can I see Aquanova at Lakeview Village floor plans?
Aquanova floor plans come with the price list and change with each release, so ask for the current set. When you compare plans, look at the price per square foot, the exposure, whether parking and a locker are included, and the estimated maintenance fee per square foot. Compare those with resale suites in Mississauga before you choose one.
Is Aquanova at Lakeview Village a good investment in 2027?
Aquanova is better suited to end users than short-term investors in 2027. New condo sales across the GTHA were 78% below the 10-year average in Q3 2026, according to Urbanation, and Lakeview Village plans about 12,000 or more homes over about 15 years. Investors also do not qualify for Ontario’s owner-occupier HST rebate, so the numbers are tighter.
Do Aquanova buyers qualify for the new home HST rebate?
Some Aquanova buyers may qualify. CRA Notice 346 says Ontario’s enhanced rebate applies to agreements signed from 1 April 2026 to 31 March 2027 for a primary residence, refunding up to $80,000 of the provincial HST. Ontario’s New Home Affordability Payment can add up to $50,000. Eligibility rules apply, so confirm with your lawyer before signing.
Can I cancel an Aquanova condo purchase after signing?
Yes, within 10 days. Section 73 of Ontario’s Condominium Act lets a new condo buyer rescind the agreement if the builder receives written notice within 10 days of the latest of receiving the disclosure statement, the condo guide and the signed agreement. The deposit is then refunded with interest. After that window, cancelling usually means losing your deposit.
Is Lakeview Village in Mississauga a good place to live?
Lakeview Village is planned as a complete waterfront community on 177 acres, with more than 45 acres of parkland, six parks, a public pier and about 9,000 jobs, according to the City of Mississauga. In 2027 it will still be largely under construction, so early residents trade years of building activity for a new home close to Lake Ontario.
Sources
- City of Mississauga: Lakeview Village project
- The Pointer: Mississauga residents skeptical after Lakeview Village proposal drops by 4K units (4 September 2026)
- HCRA Ontario Builder Directory: Baldanine Development Corp. (Aquanova Condos, 416 units)
- Urbanation: GTHA new condo sales double from a year ago in Q3 (19 October 2026)
- CRA Notice 346: Ontario enhanced new housing rebate (August 2026)
- Tarion: Pre-possession (deposit) coverage
- Tarion: Important updates on information sheets, addenda and cooling-off period
- Condominium Act, 1998, s. 73 (Ontario e-Laws)
Related reading
- Pre-Construction Homes and Condos in Oakville (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Mississauga (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Brampton (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Milton (2027): Projects, Prices and Deposits
About the author — Jatin Dua, Toronto and GTA real estate broker
I am Jatin Dua, Broker of Record and co-founder of RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway, Toronto. I work with buyers and sellers across Toronto and the GTA and have helped more than 100 families sell. Four-plus years of active GTA transactions and over $100 million in sales volume.
Reach me at [email protected] or 833-330-1925, or book a call.
More from the library
- Living at The Grand Residences at Parkside Village, Mississauga: 2027 Buyer and Renter Guide
- Pre-Construction Homes and Condos in Whitby and Oshawa (2027): Projects, Prices and Deposits
- Ravine Lots and Walk-Out Basements: What the Premium Is Actually Worth
- YCC 3, 8, 10, 19 and 25: five of Ontario’s earliest condominium corporations are all in north Etobicoke
- Buying a Restaurant: Asset Purchase vs Share Purchase from the Buyer’s Side
- Brunswick Court, 403 Brunswick Ave: Six Annex Homes in a House Form
