Published 12 November 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty
Most new-build warranty claims in Ontario fail for one reason, and it is not that the defect was not real. It is that the form was submitted on the wrong day.
What's Your Home Worth Right Now?
Get a free AI-powered price range for your property in under 90 seconds, based on recent GTA comparable sales. No name or address required.
Get My Free Estimate →Tarion’s warranty is built around four forms and a calendar that starts the day you take possession. Miss a window and the item is gone, regardless of how obvious the problem is. Here is the calendar, in plain terms.
Everything counts from your date of possession
Not the date you signed. Not the date of occupancy permit. The date you took possession. Write it down and work from it.
The first year: three forms, three windows
The Initial Form
You can start adding items on day 1 after possession. It is automatically submitted on day 41.
This is your first chance to report items you find after moving in. The automatic submission is the detail people miss — you do not press a button at the end, the form goes in on its own on day 41 with whatever is on it. If you are still finding things, that is fine: items left off can go on the next form.
The Mid-Year Form
You can start adding items on day 42. It is automatically submitted on day 183.
Your second chance at first-year items.
The Year-End Form
You can start adding items on day 183. It is automatically submitted on day 365.
This is your final chance to report one-year warranty items, and only one Year-End Form is accepted. There is a 10-day grace period for items you missed before the deadline — but forms filed in that window must be submitted manually, and you must include written proof that you reported those items to your builder during the first year.
That proof requirement is why you should put every single concern to your builder in writing from the day you move in. A phone call you cannot evidence is worth nothing in the grace period.
The second year
The Second Year Form
Submit any time during the second year of possession, and you can submit as many as you need. This covers items under the two-year warranty.
The unlimited submissions are a genuine advantage. If something appears in month 14 and something else in month 22, file twice. There is no reason to save them up.
Years three to seven
The Major Structural Defect Form
Submit any time after the second year of possession and no later than seven years from the date of possession. You can submit more than one.
The seven-year warranty is narrow — it covers major structural defects, not general disappointment with construction quality. But the window is long, and more than one form is permitted.
The calendar in one place
| Form | Open from | Submitted | Covers |
|---|---|---|---|
| Initial | Day 1 | Automatically, day 41 | First-year items |
| Mid-Year | Day 42 | Automatically, day 183 | First-year items |
| Year-End | Day 183 | Automatically, day 365 (+10-day manual grace) | First-year items — final chance |
| Second Year | Start of year 2 | Any time in year 2, multiple allowed | Two-year warranty items |
| Major Structural Defect | After year 2 | Any time up to 7 years, multiple allowed | Major structural defects |
The five habits that make the difference
- Put possession day in your calendar with four reminders — day 35, day 175, day 355, and the start of year two. The automatic submissions mean the cost of forgetting is silent.
- Report everything to the builder in writing, always. Email, not conversation. This is what the grace period requires and what any dispute turns on.
- Photograph with a date. Wide shot for location, close shot for the defect.
- Do not wait to batch items up. Add them to the open form as you find them. An item you meant to include is an item you did not include.
- Describe the symptom, not your diagnosis. “Water staining on the ceiling below the ensuite, appearing after showers” is a reportable item. “Bad plumbing” is an argument.
What the warranty does not do
Tarion is not a substitute for your own inspection, and it is not a quality guarantee. It covers specified defects for specified periods, with its own standards and dispute process. Plenty of things that annoy a new homeowner are not warranted at all.
And it does not rescue you from a bad builder. It gives you a backstop and a process. Which is a reason to look hard at who you are buying from before you sign, not after.
Warranty coverage, standards and timelines are set by Tarion and can change. Confirm the current requirements on Tarion’s own site and in your warranty documents, and get advice on a specific claim.
Sources
More from the library
- Shoreline Protection on Lake Ontario: Armour Stone, Seawalls, Groynes and Who Pays
- Radon in Ontario homes: the 91-day rule that most real estate tests fail
- Insuring a Luxury Home in Toronto: Why the Quote Comes Back Strange
- 7 Things Luxury Buyers in Toronto Pay Extra For (and 5 They Don’t)
- Retiring in Markham: A 2027 Guide to Costs, Housing and Care
- Harbour Square, 33 Harbour Square: The 1976 Original on the Water
