Published 2 November 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty

M6 Condos is not selling. The HCRA builder directory lists M City Phase 6 at 3900 Confederation Parkway as cancelled on 17 July 2026 because the sales threshold was not met, with 304 agreements terminated. In October 2026 Urban Capital bought the M6, M7 and M8 lands, and new plans are still to come.
This review is for anyone who searched for M6 Condos at M City in Mississauga City Centre, including buyers who signed for a suite. The short version is that the tower, as it was launched in 2023, has been cancelled. Below you will find what the public record says, what happens to deposits, what may come next on the site, and which projects to look at instead, as of November 2026.
Is M6 Condos still selling in 2027?
No. The HCRA Ontario Builder Directory lists “M City Condominiums – Phase 6” at 3900 Confederation Parkway, with 825 units, as cancelled. The reason given is that the sales threshold was not met. The record shows 304 terminated agreements and a last status update of 17 July 2026. The licence of the vendor company, Rogers M City VI Development Limited, also shows as expired.
Then on 26 October 2026, insauga and Real Estate News Exchange (RENX) reported that Urban Capital had bought the remaining M City development lands, the sites for M6, M7 and M8, from Rogers Real Estate Development. Urban Capital said plans for those phases will be announced later. So if anyone offers you an M6 suite on the old terms, ask exactly what you would be signing. My M6 project page will be updated when a new plan is public.
What was M6 Condos at M City?
M City is the master-planned community at Burnhamthorpe Road West and Confederation Parkway, a short walk from Square One. insauga describes it as a 15-acre community planned for eight towers and more than 6,000 homes, first launched in 2017.
When M6 launched in October 2023, UrbanToronto described it as a 57-storey tower with 840 homes by Rogers Real Estate Development and Urban Capital, designed by Hariri Pontarini Architects. Suites ranged from studios to three bedrooms plus townhouse suites, from about 270 to more than 1,200 square feet. Planned amenities included a lap pool, a fitness centre, a multi-sport court and a rooftop running track. By October 2026, RENX described M6 as 58 storeys with 889 units, and said Urban Capital had reported over 30% of units sold as of October 2025.
The different unit counts (840, 889 and 825) show how plans change before a tower is built. It is one reason I always read the regulator’s record, not the brochure.
What happens to M6 deposits after the cancellation?
If you signed for an M6 suite, your deposit should come back. Tarion says that when a builder terminates a condo agreement, the deposit must be returned within 10 days, and Tarion’s deposit protection applies if it is not. Condo deposits must also be held in trust under the Condominium Act. Tarion protects condo deposits up to $20,000.
Practical steps for affected buyers:
- Keep the termination notice, your agreement and proof of every deposit you paid.
- Ask your lawyer whether interest is owed on the money and confirm the refund amount in writing.
- If the refund is late, contact Tarion promptly and keep a record of every call and email.
I cover the full process, including what Urbanation has reported about cancelled units across the region, in what a cancelled pre-construction project means for your deposit, and the wider rules in builder delays and cancelled projects in Ontario.
Who is behind M City, and what is the track record?
The cancellation of one tower does not erase the rest of the record, which is strong. The HCRA directory shows the first two M City towers completed in June 2024, with 781 and 793 units. M3 (948 units), M4 (954 units) and M5 (430 units) are listed as in progress. The M City related group shows four chargeable conciliations across 2,442 condo units. A chargeable conciliation is a case where Tarion found a warranted defect that the builder did not fix in time.
Urban Capital, the company that now owns the M6 to M8 lands, managed the development of M1 to M5, according to its October 2026 statement reported by insauga. Its own HCRA related-group summary lists 4,779 condo units and 13 chargeable conciliations.
What will be built on the M6 site?
Nobody can say yet. RENX reported that the lands total about 1.5 million square feet of floor area and that no construction start has been announced for M6, M7 or M8. It also reported that in October 2025 Urban Capital was considering switching M7 and M8 to purpose-built rental. Any relaunch of M6 would come with a new agreement, a new price list and possibly a new design.
If you want to hear when a new M6 plan or price list appears, or you want current pricing on the alternatives below, send me a note below and I will send what I have.
Get the price list and floor plans
Tell me which project or area you are looking at. I will send the current price list, available floor plans, the deposit structure and the incentives on offer, plus my honest read on whether it is worth it.
I will send what I have on it personally, usually the same day.
What should I look at instead of M6 Condos?
If you wanted a new condo in or near Mississauga City Centre, these are the closest real options on the public record today. Availability changes week to week, so ask for current inventory.
- M5 at M City. The HCRA lists M City Phase 5 at 3880 Fitzroy Street, 430 units, as in progress, and insauga reports that M1 to M5 are completed or under construction. Same master plan as M6, but a tower that is actually going up.
- Above Condos on Hurontario. A Marlin Spring project at 30 Bristol Road East. The HCRA lists two Above Condos projects there, 137 and 440 units, both in progress.
- Aquanova at Lakeview Village. Not downtown, but a 416-unit condo by the Greenpark group in Mississauga’s new waterfront community, listed as in progress by the HCRA.
For finished buildings, my Mississauga City Centre condo buildings guide lists the towers you can buy into today on the resale market.
How do City Centre condo prices compare with resale in 2027?
M6’s old price list no longer applies, but resale prices tell you what similar homes are worth now. These are medians for all of Mississauga, not for M City.
| Mississauga resale | Jan–Oct 2024 | Jan–Oct 2025 | Jan–Oct 2026 | Avg days on market 2026 |
|---|---|---|---|---|
| Condo apartment median | $583,000 | $535,000 | $485,000 | 42 |
| Condo apartment sales | 1,493 | 1,275 | 1,213 | – |
| Condo townhouse median | $797,500 | $750,000 | $689,300 | 37 |
Source: TRREB MLS data via REALM, January–October of each year. Resale medians for the whole City of Mississauga.
The median resale condo apartment in Mississauga has fallen about 17% in two years. Across the Greater Toronto and Hamilton Area, Urbanation reported only 760 new condo sales in Q3 2026, 78% below the 10-year average, and an average new-condo asking price of $1,157 per square foot. That gap between new and resale prices is exactly why towers like M6 struggle to hit their sales targets.
What are the pros and cons of buying at M City now?
Pros
- A downtown address a short walk from Square One and a short ride from the Hurontario LRT line.
- A master plan with two finished towers you can walk through and three more listed as in progress.
- Buyers have leverage. With new condo sales this slow, incentives and softer deposit schedules are easier to ask for.
Cons
- Heavy supply. M City alone plans more than 6,000 homes, and other towers are rising nearby.
- Resale condo prices in Mississauga are still falling, which raises the risk of a low appraisal at closing.
- The M6 cancellation shows that even a well-known master plan can stall when sales slow.
Who should wait for an M6 relaunch, and who should buy elsewhere?
Wait for a relaunch if you specifically want a new suite in the last phases of M City, you have no deadline, and you are happy to judge a new price list when it arrives.
Buy elsewhere if you need a home in the next few years. A tower that is already under construction, or a finished building on the resale market, gives you a much clearer date and price. Remember that the Ontario HST rebate for buyers who sign by 31 March 2027 requires construction to begin by 31 December 2028, according to CRA Notice 346, which a relaunched tower may not meet.
I would not wait on M6 unless it is the only building you want. Resale condos in Mississauga are about 17% cheaper than two years ago and you can see exactly what you are buying. If you want new, look at a tower that is already rising, ask for the sales-threshold and termination clauses in writing, and compare the price per square foot with resale before you sign.
What risks come with any pre-construction condo in Mississauga?
- Cancellation. As M6 shows, a project can be cancelled if it does not reach its sales threshold. Read that clause in your agreement.
- Delays. Occupancy dates are targets. Tarion sets the rules on extensions and compensation.
- Interim occupancy. You pay a monthly fee to live in the unit before the building registers. See interim occupancy explained.
- Appraisal gap and assignments. If values fall, your lender may lend less than your price, and assigning your unit in a slow market is hard.
Be careful with anyone still selling “M6” suites, priority lists or assignments on the old project. The HCRA record shows the original M6 project as cancelled. Ask for the vendor’s name, its HCRA licence number and the condo project record before you hand over any money.
What to do next
- If you signed for M6, confirm your refund in writing with your lawyer and keep every receipt.
- Decide whether you need a home soon or can wait for a new M City plan.
- Compare M5, Above Condos and resale City Centre towers on price per square foot.
- Check any vendor in the HCRA Ontario Builder Directory before you sign.
- Use the 10-day condo cooling-off period to have a lawyer review the agreement.
Use the form above or go to the M6 project page and I will tell you when anything changes. My Mississauga pre-construction guide for 2027 covers the full list of projects selling in the city.
Need help with this? Talk to me.
I’m Jatin Dua, Broker of Record at RE/MAX Quantum Realty, and I’m the best agent to do this kind of work for you in Toronto and across the GTA. Over $100 million in GTA sales and 100+ families helped sell. Feel free to contact me any time: call or text 833-330-1925 or email [email protected].
Frequently asked questions
Is M6 Condos at M City cancelled?
Yes. The HCRA Ontario Builder Directory lists M City Condominiums Phase 6 at 3900 Confederation Parkway, Mississauga, as cancelled, with a last status update of 17 July 2026. The reason given is that the sales threshold was not met, and 304 agreements were terminated. In October 2026 Urban Capital bought the M6, M7 and M8 lands and said new plans will follow.
What is the M6 Condos price in 2027?
There is no current M6 price in 2027 because the original project was cancelled in July 2026, according to the HCRA record. Any relaunch would come with a new price list. For comparison, resale condo apartments across Mississauga sold for a median of $485,000 from January to October 2026, per TRREB MLS data via REALM.
Will M6 Condos buyers get their deposits back?
They should. Tarion says that when a builder terminates a condo agreement, the deposit must be returned within 10 days, and its deposit protection of up to $20,000 applies if it is not. Condo deposits must also be held in trust under Ontario’s Condominium Act. M6 buyers should confirm the refund amount and any interest with their lawyer.
Who bought the M City M6 land?
Urban Capital bought the remaining M City development lands, the sites for M6, M7 and M8, from Rogers Real Estate Development, as reported by insauga and RENX on 26 October 2026. The lands cover more than four acres and about 1.5 million square feet of floor area. Urban Capital said details of the next phases will be announced as plans progress.
How many storeys and units was M6 Condos?
Reports differ. UrbanToronto described M6 as 57 storeys and 840 homes at its October 2023 launch, RENX described it as 58 storeys and 889 units in October 2026, and the HCRA record lists 825 units for the cancelled project. The tower was designed by Hariri Pontarini Architects and was the sixth of eight planned M City towers.
What are the M6 Condos floor plans?
The original M6 floor plans no longer apply because the project was cancelled in July 2026. At launch in 2023, UrbanToronto reported suites from studios to three bedrooms plus townhouse suites, from about 270 to over 1,200 square feet. If the site is relaunched under Urban Capital, expect new plans and a new price list.
What is the M6 Condos deposit structure?
There is no live M6 deposit structure in 2027, because the original project was cancelled in July 2026 according to the HCRA directory. Buyers who paid deposits should get them back under Tarion and Condominium Act rules. If a new version of M6 launches, its deposit schedule will be in a new agreement, and the 10-day condo cooling-off period will apply.
What are the best alternatives to M6 Condos in Mississauga?
The closest alternatives are towers already in progress. The HCRA lists M City Phase 5 at 3880 Fitzroy Street (430 units) and Above Condos by Marlin Spring at 30 Bristol Road East as in progress, as of November 2026. Resale towers in Mississauga City Centre are another option, with the city’s condo apartment median at $485,000 in 2026.
Is M City a good place to buy a condo in 2027?
M City is central, a short walk from Square One and a short ride from the Hurontario LRT line, and its first two towers were completed in June 2024. The risk in 2027 is supply: M City plans over 6,000 homes, and Mississauga resale condo medians fell 9.3% in 2026. It suits long-term owners more than short-term investors.
Sources
- HCRA Ontario Builder Directory: Rogers M City VI Development Limited (M City Phase 6, cancelled)
- insauga: M City condo development lands sold in Mississauga (26 October 2026)
- RENX: Urban Capital acquires Mississauga M City land (26 October 2026)
- UrbanToronto: M6 launches as third-last tower of M City community (16 October 2023)
- Urbanation: GTHA new condo sales double from a year ago in Q3 (19 October 2026)
- Tarion: Pre-possession (deposit) coverage
- CRA Notice 346: Ontario enhanced new housing rebate (August 2026)
- Condominium Act, 1998 (Ontario e-Laws)
Related reading
- Pre-Construction Homes and Condos in Oakville (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Mississauga (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Brampton (2027): Projects, Prices and Deposits
- Pre-Construction Homes and Condos in Milton (2027): Projects, Prices and Deposits
About the author — Jatin Dua, Toronto and GTA real estate broker
I am Jatin Dua, Broker of Record and co-founder of RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway, Toronto. I work with buyers and sellers across Toronto and the GTA and have helped more than 100 families sell. Four-plus years of active GTA transactions and over $100 million in sales volume.
Reach me at [email protected] or 833-330-1925, or book a call.
More from the library
- Living at Daniels City Centre, Mississauga: 2027 Buyer and Renter Guide
- Pre-Construction Homes and Condos in Georgetown and Halton Hills (2027): Projects, Prices and Deposits
- The 10-Day Cooling-Off Period for New Freehold Homes Now Starts January 1, 2028
- Islington Place, Thistle Down Terrace and Richgrove Village: three townhouse corporations, and a City document that names one
- Taking Over Restaurant Staff When You Buy in Ontario: What the ESA Means for the Buyer
- Prime Condos, 319 Jarvis St: Small Suites, Big Shared Spaces
How this estimate is produced
The estimate blends recent selling prices for comparable units in the area with the details you entered: size, bedrooms, floor, exposure, parking, locker and condition. It is a statistical estimate, not an appraisal and not a formal opinion of value.
What it cannot see
- Interior condition and upgrades beyond what you told it
- Unit-specific issues: noise, an obstructed view, a pending special assessment
- Your reserve fund and where the maintenance fee is heading
- What is competing with you in your own building right now
What moves the number most
- Floor and exposure, which can separate otherwise identical units
- Parking and locker, each priced separately by buyers
- Kitchen and bathroom condition
- Maintenance fee per square foot against the rest of the building
Treat it as a range, not a price
A single figure to the dollar would be false precision. Use the estimate to decide whether a move is worth exploring. Before you price anything for the market, the number needs checking against what is actually selling and sitting in your building this month, and that takes a person. I will do that for you at no cost and with no obligation.
Market data is sourced from the Toronto Regional Real Estate Board. Information is deemed reliable but is not guaranteed. This tool does not provide an appraisal or a formal opinion of value, and it is not a substitute for advice on your specific property. Jatin Dua, Broker of Record, RE/MAX Quantum Realty.