The Queensway Complete Street: bike lanes approved in 2022, built in 2027

Abstract editorial illustration of two parallel bands separated by a raised red divider form

Last updated 30 August 2026. Written by Jatin Dua, a licensed Realtor with RE/MAX Quantum Realty, 799 The Queensway — on the street this project will rebuild. Every figure below is sourced and dated.

What's Your Unit Worth Right Now?

Get a free AI-powered price range for your condo in under 90 seconds — floor, exposure, view, parking and locker included. No name or address required.

Get My Free Estimate →
Quick answer

The Queensway Complete Street is a City of Toronto project that will add raised and protected bicycle lanes on both sides of the street, from the Humber River to Burma Drive near Mimico Creek. City Council approved it on 7 April 2022.

It has not been built. The project is in detailed design, and construction is anticipated in 2027, deferred because of the Gardiner bridge repairs and the traffic impacts they create. If a listing claims a property is on a protected bike route, it is describing something that does not exist yet.

What was approved

Field What the City says
Extent The Queensway from the Humber River to Burma Drive, near Mimico Creek
Infrastructure “Raised and protected bicycle lanes on both sides of the street”
Design Cycle tracks raised to be level with the sidewalk, separated from the roadway by a curb
Approval City Council, 7 April 2022, item IE28.7. Endorsed by the Infrastructure and Environment Committee on 29 March 2022
Current stage Detailed design
Construction Anticipated 2027, deferred because of the Gardiner bridge repairs

How I know it is not built yet

Not because I looked out of the window, though I did. Because The Queensway does not appear anywhere in the City’s Cycling Network Plan: 2025 Cycling Infrastructure — Fourth Quarter Update, published 20 November 2025. Infrastructure that has been installed shows up in those quarterly reports. This has not.

The City’s own project page also still describes construction as anticipated rather than underway or complete.

Why raised cycle tracks matter more than paint

There is a meaningful difference between a painted bike lane and what is approved here. A raised cycle track sits at sidewalk level and is separated from traffic by a curb. On a road with the traffic volumes and truck movements The Queensway carries — it runs past the Ontario Food Terminal and through the second-largest employment concentration in Toronto — that difference is not cosmetic.

It also changes the street. Curbs, level changes and a rebuilt boulevard mean the corridor gets reconstructed rather than repainted, which is part of why it is a 2027 project rather than a 2023 one.

The dependency worth understanding

Construction was deferred because of the Gardiner Section 3 rehabilitation, which runs from Highway 427 to the Humber River with early works through December 2026 and full rehabilitation starting as soon as 2027.

Note that those two 2027 dates sit on top of each other. The City has not published a Section 3 completion date. I would treat the Complete Street’s 2027 construction date as an anticipated date rather than a commitment, and I would not be surprised to see it move again.

What exists for cycling today

Below the corridor, the waterfront trail network along Humber Bay is genuinely good and well used, and it connects east toward downtown. The Park Lawn Lake Shore Transportation Master Plan also proposes new traffic signals on Lake Shore Boulevard West between Park Lawn Road and Brookers Lane to improve pedestrian and cycling crossings to the waterfront, and uni-directional cycle tracks on a proposed new north–south street.

What does not exist today is safe, separated, east–west cycling on The Queensway itself. That is exactly the gap this project is meant to close.

My read

This is a good project and I would like it built. But approved is not built, and 2022 to 2027 is five years to get from a Council decision to a shovel. Buy the street as it is. If the cycle tracks arrive, treat it as a genuine improvement you did not pay for in advance.

Cycling matters to you? Let us look at this properly.

If the ride to work is part of why you are choosing a neighbourhood, I can walk you through what actually exists on the ground today versus what is approved on paper, for any address on this side of the city. It is a short conversation and it saves a lot of disappointment.

connect@jatindua.com · 437-987-1925 · Book a free consultation

Confidential. Read personally and answered within 24 hours. I never share, sell or distribute your information.

Free tool — AI condo value estimator

Condo Valuation

What’s your condo
worth today?

Three quick steps. Condos don’t price like houses — your floor, your view, and whether you own parking move the number more than anything else. This weighs all of them.

01Your Building
02Your Unit
03Extras & Report

Where is the condo?

Building and area do most of the work. A Humber Bay tower and a Scarborough mid-rise are different markets entirely.

Please enter the building address or name.

Please choose the closest area.

Please choose the building age.

Tell me about your unit

Drag to your floor. In a Toronto tower each storey up is worth real money — and the view is worth more again.

Please choose your layout.

700 SQ FT
3003,000+
12
Ground
12FLOOR
160+

Mid-rise. Solid, but the premium really starts higher up.

Pick one

Extras, then your report

Parking is the single biggest add-on in a Toronto condo — in some buildings it’s worth more than a renovation.

Please choose the condition.

Please enter your name.

Please enter a valid email address.

Please enter a phone number.

No cost, no obligation.
Your details are never sold or shared.

Reading recent condo sales…

Estimated market value

$0$0

Most likely $0 · about $0 per square foot

What moved the number

Starting from what comparable units in your area sell for, here’s what your specifics added or subtracted.

Market context

Average condo sale, your area
Days on market

Two units, same floor plan,
$90,000 apart.

That happens constantly in condos — one has the parking, the right exposure, or a board that keeps the reserve fund healthy. A model can’t see your status certificate. I can.

How this works — your estimate comes from a model built on recent Toronto & GTA condo sale data, weighting area, size, layout, floor, exposure, view, parking, locker, age and condition. It is an automated estimate for information only — not an appraisal and not a Comparative Market Analysis. Condo values also depend on the building’s reserve fund, maintenance fees, recent special assessments and status certificate, none of which a model can read. Ask me for a written CMA before you make a decision.

Frequently asked questions

Are there bike lanes on The Queensway in Etobicoke?

Not yet. City Council approved The Queensway Complete Street on 7 April 2022, which will add raised and protected bicycle lanes on both sides of the street from the Humber River to Burma Drive. The project is in detailed design and construction is anticipated in 2027.

When will The Queensway bike lanes be built?

The City anticipates construction in 2027. That date was deferred because of the Gardiner bridge repairs and their traffic impacts. Since the Gardiner Section 3 full rehabilitation is itself scheduled to start as soon as 2027 with no published completion date, the 2027 cycling date should be treated as anticipated rather than fixed.

What kind of bike lanes are planned for The Queensway?

Raised and protected cycle tracks on both sides of the street, level with the sidewalk and separated from the roadway by a curb — not painted lanes.

How far will The Queensway Complete Street extend?

From the Humber River in the east to Burma Drive, near Mimico Creek, in the west.

Related reading

Sources

Every figure on this page traces to one of these. Checked 30 August 2026.

About the author — Jatin Dua, Etobicoke real estate agent

I’m a licensed Realtor with RE/MAX Quantum Realty at 799 The Queensway in Etobicoke. My office is on this street, which is the only reason I can write pages like this one: I walk past these sites, I read the City files, and I check the numbers against the source rather than repeating what a marketing page says. I work with buyers, sellers and investors across Stonegate–Queensway, Mimico, Humber Bay Shores, New Toronto, Long Branch and Alderwood.

Questions about a specific suite or a specific site? connect@jatindua.com or 437-987-1925.

Please read this. This page is general information for Ontario residents, not legal, tax, financial or investment advice, and it is not a substitute for a lawyer’s review of a status certificate or an accountant’s review of your numbers. Building, planning and market figures are drawn from the public sources listed above on the date shown and can change without notice; where those sources disagree with each other, I have said so rather than quietly picking a number. Development applications described here are proposals or approvals, not guarantees that anything will be built, and approved projects change. Always verify unit-specific facts — fees, parking, locker, exclusive-use areas, rules and any special assessment — against the condominium corporation’s own documents before you commit. Not intended to solicit buyers or sellers currently under contract with another brokerage. E. & O.E.