IQ Condos Phase 3 Review (2027): Prices, Deposit Structure, Pros and Cons

Published 2 November 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty

Vacant development lot beside condo towers near an expressway in Etobicoke (illustrative)

By Jatin Dua · Broker of Record, RE/MAX Quantum Realty · Updated 2 November 2026 · 10 min read — IQ Condos Phase 3 on Zorra Street, Etobicoke, has not launched as of November 2026. What the City file says, the builder record and what to buy instead.

Short answer

IQ Condos Phase 3 has not launched. The City of Toronto file for 35 Zorra Street describes 915 units in three towers of 19, 26 and 42 storeys, at the site plan conditions stage since its 2020 application. There is no public price list, deposit schedule or occupancy date, so any figure you see is provisional.

This review is for buyers who searched for IQ Condos Phase 3 and want to know whether they can buy, at what price, and when. The short answer is that the project has not launched. Below you will find what the City of Toronto file says, how far along the approvals are, the builder’s record, how the area’s resale prices look, and what to buy now if you do not want to wait, as of November 2026.

Is IQ Condos Phase 3 selling in 2027?

Not yet. As of November 2026, I could find no public price list, no released floor plans, no occupancy date and no condominium project for IQ Phase 3 in the HCRA Ontario Builder Directory. UrbanToronto’s project database lists it as pre-construction. In August 2024, UrbanToronto reported that the developer was preparing a sales centre and that the project was approaching the market, but no launch had followed by the time of writing.

So treat IQ Phase 3 as a registration-list project, not a purchase decision. If someone shows you a price, ask where it came from and whether a real agreement is behind it. I keep my IQ Condos Phase 3 project page updated with what the record shows.

What is planned at 35 Zorra Street?

IQ Phase 3 is the final phase of The Remington Group’s IQ community off The Queensway in Etobicoke. The site is at 35 Zorra Street, between Kipling and Islington avenues, south of The Queensway and along the north side of the Gardiner Expressway, across from Senator Marian Maloney Park.

The City of Toronto’s development application record (file 20 102991 WET 03 SA) describes the plan as 915 units in three towers of 19, 26 and 42 storeys, joined by a three-storey podium, with 773 parking spaces. UrbanToronto’s August 2024 report on the resubmission adds:

  • The architect is Giannone Petricone Associates.
  • The tallest tower would hold 435 of the 915 units.
  • The mix included 20 studios, 535 one-bedroom suites and 38 three-bedroom suites (the two-bedroom count was not given).
  • The two shorter towers on the north half would come first, and the 42-storey tower second.

UrbanToronto gave the heights as 18, 25 and 42 storeys, while the City record says 19, 26 and 42. Small gaps like this are common while a plan is still being revised. The City’s description is the one tied to the application.

How far along are the approvals for IQ Phase 3?

The zoning for the IQ community was approved by City Council in 2014, according to UrbanToronto. The site plan application for Phase 3 was submitted on 9 January 2020, resubmitted in July 2022 and revised again in August 2024. The City’s record now shows the status “NOAC Issued,” which means a Notice of Approval Conditions: the City has set out the conditions the owner must meet before final site plan approval.

That is real progress, but it is not a construction start. After final approval, the builder still needs to launch sales, usually reach a sales threshold, arrange financing and get building permits. Each step can take months or years.

Who is Remington, and what is its track record here?

This is the strongest part of the story. Remington has already built two phases on this same block. The HCRA directory lists:

  • IQ Smart, 1185 The Queensway: 303 units, completed in 2015.
  • Park Towers, 15–17 Zorra Street: 520 units, completed in 2018.

The same directory lists other finished Remington Group condos in Markham, including York Condos (2021), Gallery Square (2024) and Gallery Towers (2025). The Remington Group’s related-company summary shows 2,519 condo units and no chargeable conciliations. You can walk through Phases 1 and 2 today, which is a far better test than any rendering. My guide to IQ Condos vs Park Towers at IQ explains which building is which.

If you want to be told when IQ Phase 3 releases a real price list, or you want current pricing on the alternatives below, send me a note below and I will send what I have.

Get the price list and floor plans

Tell me which project or area you are looking at. I will send the current price list, available floor plans, the deposit structure and the incentives on offer, plus my honest read on whether it is worth it.

This goes straight to me, not a call centre. No spam, and I never sell your details.

Got it, thank you.
I will send what I have on it personally, usually the same day.

How much will IQ Condos Phase 3 cost?

No one can say yet. There is no published price for Phase 3, and any figure you see online is either from an earlier phase or a guess. What you can check is what resale condos sell for in the same part of Etobicoke today.

Resale (TRREB district) Jan–Oct 2024 Jan–Oct 2025 Jan–Oct 2026 Avg days on market 2026
W08 condo apartment median $603,500 $575,000 $525,000 38
W08 condo apartment sales 677 549 507 –
W08 condo townhouse median $832,500 $817,500 $747,500 39
W07 condo apartment median $635,000 $615,000 $584,000 36

Source: TRREB MLS data via REALM, January–October of each year. District-wide resale medians. W08 covers Islington-City Centre West, including Zorra Street, and other central-west Etobicoke communities; W07 is Stonegate-Queensway.

The W08 condo median has fallen about 13% in two years. When IQ Phase 3 does launch, compare its price per square foot with Park Towers and IQ Smart resales on the same block. That is the cleanest test you will ever get for a new condo.

Will the HST rebates apply?

Only if timing works. CRA Notice 346 says Ontario’s enhanced new housing rebate covers agreements signed from 1 April 2026 to 31 March 2027, for a primary residence, and that construction of a builder-sold home must begin by 31 December 2028. A project that has not launched may miss that window. Ask your lawyer before you assume any rebate.

What is the IQ Phase 3 deposit structure?

There is none yet, because there is no agreement to sign. When one appears, check three things. First, total the deposits and their dates, and make sure you can pay them from savings; my deposit calculator helps. Second, Tarion protects condo deposits up to $20,000, and condo deposits must be held in trust under the Condominium Act. Third, a phased project with a long timeline is a good reason to ask for a smaller, slower deposit schedule.

What should I buy instead of waiting for IQ Phase 3?

If you want something new near The Queensway without waiting years, these are real options on the public record:

  • Curio Condos, 799 The Queensway: a 10-storey, 206-unit building listed as completed in the HCRA directory in February 2026. Any remaining finished suites close without a long wait or an interim occupancy period, so ask me what is left.
  • BLVD Q Condos, 935 The Queensway: a 10-storey, 210-unit building on the City’s site plan file, near Kipling.
  • Joya Condominiums, 1045–1049 The Queensway: a 321-unit Marlin Spring project listed as in progress by the HCRA. I compare it with BLVD Q in pre-construction on The Queensway.

For the wider picture, read my Etobicoke pre-construction guide for 2027 and my file-by-file check of six pre-construction projects in the west GTA.

What are the pros and cons of IQ Condos Phase 3?

Pros

  • A builder that has already delivered two phases on the same block, with no chargeable conciliations on its condo group record.
  • A site plan at the approval-conditions stage, not a vague proposal.
  • Quick access to the Gardiner and The Queensway, with a park across the street.

Cons

  • No launch, no price and no date after more than six years in site plan review.
  • A lot of supply on one street. City files show a 459-unit condo at 30–44 Zorra and a 28-storey, 319-unit tower proposed at 10–18 Zorra. A 2026 draft Official Plan amendment for 1233–1255 The Queensway also proposes new streets and a park linking to Zorra Street.
  • Next to an expressway, so noise and views depend on your tower and side.

Who should wait for IQ Phase 3, and who should look elsewhere?

Wait if you specifically want to live on this block, you have no deadline, and you like what you see when you walk through Park Towers. Get on a registration list, but do not pay anything until there is a real agreement and a Tarion-enrolled project.

Look elsewhere if you need a home in the next few years, want a rebate that depends on 2027 timing, or are buying to rent. Resale in W08 is cheaper than two years ago and you can see exactly what you are getting.

My take

IQ Phase 3 has the best due-diligence advantage of any Etobicoke launch, because the builder’s finished product is right next door. But a project is only a purchase once it has a price, an agreement and a Tarion enrolment. Until then, I would compare a resale suite at Park Towers or IQ Smart, or a finished Curio suite, and keep IQ Phase 3 on the watch list.

What risks come with buying IQ Phase 3 when it launches?

  • Delays. A three-tower, two-phase project can take years longer for the second tower.
  • Interim occupancy. You will pay a monthly fee before the building registers. See interim occupancy explained.
  • Appraisal gap. If W08 resale prices stay below your price, you fund the difference at closing.
  • Assignments. Builders often limit or charge for them, and they are hard to sell in a slow market.
Watch out

Many listing sites still show IQ Phase 3 with the wrong height, unit count, address or completion date, often copied from Park Towers. Check the City file (20 102991 WET 03 SA, 35 Zorra Street) and the HCRA record before you trust any figure, and never pay a deposit to hold a place on a list.

What to do next

  1. Walk through Park Towers and IQ Smart to judge the builder’s finished product.
  2. Track the City file and wait for a Tarion-enrolled condo project before paying anything.
  3. Compare any future price per square foot with W08 resale and with recent sales on Zorra Street.
  4. If you need a home sooner, price out Curio, BLVD Q and resale suites nearby.
  5. When you sign, use the 10-day condo cooling-off period to have a lawyer review the agreement.

Use the form above or visit the IQ Phase 3 project page and I will tell you when there is something real to look at.

Need help with this? Talk to me.

I’m Jatin Dua, Broker of Record at RE/MAX Quantum Realty, and I’m the best agent to do this kind of work for you in Toronto and across the GTA. Over $100 million in GTA sales and 100+ families helped sell. Feel free to contact me any time: call or text 833-330-1925 or email [email protected].

Free tool — what is your condo worth today?

Condo Valuation

What’s your condo
worth today?

Three quick steps. Condos don’t price like houses — your floor, your view, and whether you own parking move the number more than anything else. This weighs all of them.

01Your Building
02Your Unit
03Extras & Report

Where is the condo?

Building and area do most of the work. A Humber Bay tower and a Scarborough mid-rise are different markets entirely.

Please enter the building address or name.

Please choose the closest area.

Please choose the building age.

Tell me about your unit

Drag to your floor. In a Toronto tower each storey up is worth real money — and the view is worth more again.

Please choose your layout.

700 SQ FT
3003,000+
12
Ground
12FLOOR
160+

Mid-rise. Solid, but the premium really starts higher up.

Pick one

Extras, then your report

Parking is the single biggest add-on in a Toronto condo — in some buildings it’s worth more than a renovation.

Please choose the condition.

Please enter your name.

Please enter a valid email address.

Please enter a phone number.

No cost, no obligation.
Your details are never sold or shared.

Reading recent condo sales…

Estimated market value

—

—

$0–$0

Most likely $0 · about $0 per square foot

What moved the number

Starting from what comparable units in your area sell for, here’s what your specifics added or subtracted.

Market context

—

—
Average condo sale, your area
—
Days on market

—

Two units, same floor plan,
$90,000 apart.

That happens constantly in condos — one has the parking, the right exposure, or a board that keeps the reserve fund healthy. A model can’t see your status certificate. I can.

How this works — your estimate comes from a model built on recent Toronto & GTA condo sale data, weighting area, size, layout, floor, exposure, view, parking, locker, age and condition. It is an automated estimate for information only — not an appraisal and not a Comparative Market Analysis. Condo values also depend on the building’s reserve fund, maintenance fees, recent special assessments and status certificate, none of which a model can read. Ask me for a written CMA before you make a decision.

Frequently asked questions

Has IQ Condos Phase 3 launched?

No. As of November 2026, IQ Condos Phase 3 at 35 Zorra Street in Etobicoke has no public price list, floor plans or occupancy date, and no condominium project appears in the HCRA Ontario Builder Directory. The City of Toronto site plan file, submitted in January 2020, is at the Notice of Approval Conditions stage. Treat any quoted figure as provisional.

What is the IQ Condos Phase 3 price?

There is no published IQ Condos Phase 3 price as of November 2026. For context, resale condo apartments in Toronto district W08, which includes Zorra Street, sold for a median of $525,000 from January to October 2026, down from $575,000 a year earlier, according to TRREB MLS data via REALM. Any older price you see online belongs to an earlier phase.

How many units and storeys is IQ Condos Phase 3?

The City of Toronto application for 35 Zorra Street describes 915 units in three towers of 19, 26 and 42 storeys, joined by a three-storey podium, with 773 parking spaces. UrbanToronto reported heights of 18, 25 and 42 storeys in August 2024. Listings showing 24 storeys are describing Park Towers, the completed Phase 2, which has two 24-storey towers.

What is the IQ Condos Phase 3 deposit structure?

IQ Condos Phase 3 has no deposit structure yet, because sales have not launched as of November 2026. When an agreement is offered, Tarion will protect condo deposits up to $20,000, and the Condominium Act requires condo deposits to be held in trust. Do not pay a deposit to join a list before a real agreement exists.

Who is the builder of IQ Condos Phase 3?

The Remington Group is building IQ Condos Phase 3. The HCRA directory shows Remington completed IQ Smart at 1185 The Queensway (303 units, 2015) and Park Towers at 15–17 Zorra Street (520 units, 2018) on the same block, and its condo record lists no chargeable conciliations. The architect for Phase 3 is Giannone Petricone Associates, per UrbanToronto.

When will IQ Condos Phase 3 be completed?

No completion date exists for IQ Condos Phase 3 as of November 2026, because it has not launched or started construction. UrbanToronto reported that the two shorter towers would be built first and the 42-storey tower second. Any completion year shown online is a guess, not a date from the builder’s agreement or the City.

Where are IQ Condos Phase 3 floor plans?

IQ Condos Phase 3 floor plans have not been released as of November 2026. UrbanToronto reported a planned mix that included 20 studios, 535 one-bedroom suites and 38 three-bedroom suites, but the final mix can change before launch. Until plans are released, walking through Park Towers next door is the best way to judge layouts and finishes.

What can I buy near IQ Condos Phase 3 right now?

Near The Queensway in Etobicoke, Curio Condos at 799 The Queensway was listed as completed by the HCRA in February 2026, BLVD Q at 935 The Queensway is a 10-storey, 210-unit building on the City file, and Joya by Marlin Spring at 1045–1049 The Queensway is listed as in progress. Resale suites at Park Towers and IQ Smart are another option.

Sources

Related reading

About the author — Jatin Dua, Toronto and GTA real estate broker

I am Jatin Dua, Broker of Record and co-founder of RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway, Toronto. I work with buyers and sellers across Toronto and the GTA and have helped more than 100 families sell. Four-plus years of active GTA transactions and over $100 million in sales volume.

Reach me at [email protected] or 833-330-1925, or book a call.

Please read this. General information current as at 2 November 2026. It is not legal, tax, accounting, mortgage or financial advice. I am a registered real estate broker, not a lawyer, accountant or mortgage agent. Market figures are TRREB MLS data accessed through REALM or come from the sources linked above; they describe past sales and are not a forecast. Rules, rates and programs change, so confirm details with the official source or a licensed professional before you rely on them.

More from the library

Browse every article

How this estimate is produced

The estimate blends recent selling prices for comparable units in the area with the details you entered: size, bedrooms, floor, exposure, parking, locker and condition. It is a statistical estimate, not an appraisal and not a formal opinion of value.

What it cannot see

  • Interior condition and upgrades beyond what you told it
  • Unit-specific issues: noise, an obstructed view, a pending special assessment
  • Your reserve fund and where the maintenance fee is heading
  • What is competing with you in your own building right now

What moves the number most

  • Floor and exposure, which can separate otherwise identical units
  • Parking and locker, each priced separately by buyers
  • Kitchen and bathroom condition
  • Maintenance fee per square foot against the rest of the building

Treat it as a range, not a price

A single figure to the dollar would be false precision. Use the estimate to decide whether a move is worth exploring. Before you price anything for the market, the number needs checking against what is actually selling and sitting in your building this month, and that takes a person. I will do that for you at no cost and with no obligation.

Market data is sourced from the Toronto Regional Real Estate Board. Information is deemed reliable but is not guaranteed. This tool does not provide an appraisal or a formal opinion of value, and it is not a substitute for advice on your specific property. Jatin Dua, Broker of Record, RE/MAX Quantum Realty.