RE/MAX Quantum RealtyHome valueContact

Curio vs The Tailor: 799 or 1195 The Queensway?

Published 30 August 2026 · Updated 29 September 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty

Published 30 August 2026 · Jatin Dua, Broker of Record, RE/MAX Quantum Realty

What's Your Home Worth Right Now?

Get a free AI-powered price range for your property in under 90 seconds, based on recent GTA comparable sales. No name or address required.

Get My Free Estimate →
A wide view down a long Toronto arterial road with mid-rise buildings receding into the distance on both sides
Quick answer

Curio at 799 and The Tailor at 1195 The Queensway differ most on density: roughly 21 doors per floor against 13. They also sit in genuinely different parts of the corridor, only one of which is inside the walkable service stretch.

Two new low-rise buildings at opposite ends of the corridor. One is finished, one is smaller. Which matters more depends entirely on whether you need to move this year.

Side by side

Curio The Tailor Residences
Address 799 The Queensway (also listed as 801) 1195 The Queensway
Storeys 10 11
Suites 206 142
Suites per floor (approx.) ~21 ~13
Status Complete, occupied since September 2025 Newer, west end
Developer Marlin Spring with DAMAC Properties —

Two real differences, pulling opposite ways

Curio is finished. Occupancy was September 2025. No completion risk, no interim occupancy to carry, no deposit in trust, and you can read a status certificate with actual operating numbers instead of a developer’s first-year budget. That is worth real money in 2026.

The Tailor is much less dense. Roughly 13 doors per floor against 21. Quieter corridors, shorter elevator waits, fewer people in the amenity space. If building population is what you care about, The Tailor wins clearly and it is not close.

Location: these are genuinely different neighbourhoods

Curio at 799 sits inside the walkable service cluster — the restaurants between 620 and 960, Cosimo’s NoFrills essentially across the road at 748, the dentists, groomers and cafés. Daily life without the car is realistic.

The Tailor at 1195 is a driving address with big-box convenience: Longo’s at 1055 walkable, the Kipling Queensway Mall at 1255, Cineplex at 1025, and closer to the 427. The independent cluster is a bus ride.

Neither is better. But do not let a Walk Score convince you they are equivalent, because on foot they are not.

One thing specific to The Tailor

The Cineplex site at 1025 The Queensway is an approved masterplan. Buying at the west end means buying near a significant future construction site. That is not a reason to avoid it — redevelopment usually helps values over a long hold — but you should know you may be living beside a build for several years.

My read

Need to move within a year, or want to see exactly what you are buying: Curio. The certainty premium is worth it and the location is the better everyday address.

Have time, drive anyway, and want the quietest building of the two: The Tailor, and the 13-per-floor density is a genuine, durable advantage that Curio cannot match.

Note when comparing sold data that Curio appears as both 799 and 801 The Queensway — search both.

How to compare two buildings properly

These two sit at meaningfully different points along the corridor, which matters more than most buyers expect: walkability along The Queensway is not uniform, and the difference between a continuous occupied frontage and a stretch broken by parking lots is a real difference in daily life and in resale.

Buyers comparing two buildings on the same street almost always compare the wrong things — lobby finishes, amenity lists and the headline maintenance fee. None of those decide whether the purchase works out. Six things do.

  1. The reserve fund against the age of the corporation. Both of these buildings are young enough that the fund is still accumulating and the budget has not been tested by a full operating cycle. Ask whether the first reserve fund study update has happened and what it did to the required contribution.
  2. What each fee includes, and what is separately metered. Add your own estimated utility bills to whichever excludes them before comparing. Then divide by real usable square footage rather than the marketing number.
  3. Three years of fee history for each. A young building whose fees have already jumped twice is telling you something the current number is not.
  4. Whether the corporation is party to litigation. Construction deficiency claims are not unusual in newer corporations and they affect both fees and lender appetite.
  5. Parking and locker ownership form. An owned unit, an exclusive-use common element, or a rental — only the first two convey with the sale.
  6. What is proposed on the adjacent parcels. The corridor is still developing. The City of Toronto’s development application records are public, and a view or a quiet aspect that a filed application would remove is not something to pay for today.

And then the unit, not the building

Once the corporations are understood, the remaining variables are unit-level and they are the ones that move price most: exposure, floor, whether the outlook is protected, layout efficiency and whether every bedroom has a real exterior window, balcony depth, and where the unit sits relative to the elevators and the garbage chute. Two units with the same floor plan in the same building can differ substantially on these alone.

The status certificate answers the corporation questions definitively and the fee for it is capped at $100 including taxes under the Condominium Act, 1998. Order one for whichever building you choose, and have a lawyer read it — with ten to fifteen business days on the condition, because the corporation has statutory time to produce it.

Thinking about buying or selling here?

I work this area every week and I will give you a straight answer, including when the answer is to wait. No pressure, and no drip campaign you cannot get out of.

Call or text 833-330-1925 Send me a message

Jatin Dua, Broker of Record — RE/MAX Quantum Realty Inc., Brokerage. Not intended to solicit buyers or sellers currently under contract with another brokerage.

Frequently asked questions

How do I compare two condo buildings on the same street?

Not on lobby finishes or amenity lists. Compare the reserve fund against the age of each corporation, what each fee includes and what is separately metered, three years of fee history, whether either corporation is party to litigation, the ownership form of parking and lockers, and what is proposed on the adjacent parcels.

Is a lower maintenance fee better?

Not on its own, and in this corridor it is frequently misleading. Buildings here are young, so a low fee usually reflects a reserve fund still accumulating and utilities that are separately metered rather than good management. Add your own utility estimate and read the reserve fund position before judging the number.

What does the status certificate tell me about a building?

The reserve fund balance and the study’s funding plan, any special assessment levied or contemplated, common expense arrears on the unit, legal proceedings the corporation is party to, the insurance and its deductible, any lien, and the declaration, by-laws and rules. The fee is capped at $100 including taxes.

How long should my status certificate condition be?

Ten to fifteen business days. The corporation has ten days from receiving the request and the fee to produce the certificate, so a five-business-day condition can leave your lawyer with almost no time to read it. Pay the fee immediately so the clock starts.

Does the specific unit matter more than the building?

Both matter and they answer different questions. The corporation decides your fee trajectory and your exposure to assessments; the unit decides what daily life is like and how it resells. Exposure, floor, protected outlook, layout efficiency and balcony depth move price more than anything inside the unit.

What is the risk of buying in a very new corporation?

The budget has not been tested by a full operating cycle, the reserve fund is at the start of its accumulation, and the first reserve fund study update typically raises the required contribution. Construction deficiency litigation is also more common in newer corporations. None of that is disqualifying — it just needs to be priced in.

Sources

Related reading

Building specifications from the City of Toronto planning record, condominium registrations and developers’ published material — believed accurate but not guaranteed. Verify everything against the status certificate and disclosure statement before you sign. Not intended to solicit buyers or sellers under contract with another brokerage. E.&O.E.

Thinking about buying on The Queensway?

Tell me which building or stretch of the corridor you are looking at and I will send the actual sold and lease comparables from TRREB, an honest read on the location, and what the status certificate is likely to show. No obligation, and I will tell you if the answer is don’t buy it.

Tell me what you are planning

Three quick answers so I come back with something useful, usually the same day.

Your details go to me only, never sold or shared. Prefer a set time? Book a 15-minute call.

Or call Jatin Dua, Broker of Record, RE/MAX Quantum Realty · 833-330-1925

About the author — Jatin Dua, Etobicoke real estate agent

I am Jatin Dua, Broker of Record at RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway in Etobicoke, with more than four years of active GTA transactions and over $100M in sales volume. My office is on this street, so the local detail here comes from walking it rather than from a directory.

Reach me at [email protected] or 833-330-1925.

Please read this. This page is general local information about The Queensway in Etobicoke, current as at 10 September 2026. Businesses open, close, move and change hands, and ratings change constantly — verify anything you intend to rely on directly with the business. Nothing here is legal, tax or financial advice, and it is not advice on any specific property. I am a licensed real estate broker. Photographs are illustrative. Not intended to solicit buyers or sellers currently under contract with another brokerage. E. & O.E.
Free toolWhat’s being built near me?Look up every rezoning, site plan and condo application filed near any Toronto address, with free alerts.

Leave a Comment

Your email address will not be published. Required fields are marked *

Call or text 833-330-1925
Scroll to Top