RE/MAX Quantum RealtyContact

BLVD Q, 935 The Queensway: Mattamy’s Etobicoke mid-rise

Abstract editorial illustration of a broken massing of stacked blocks in charcoal and bone tones

Last updated 30 August 2026. Written by Jatin Dua, a licensed Realtor with RE/MAX Quantum Realty, 799 The Queensway — a few minutes west along this street. Every figure below is sourced and dated.

What's Your Unit Worth Right Now?

Get a free AI-powered price range for your condo in under 90 seconds — floor, exposure, view, parking and locker included. No name or address required.

Get My Free Estimate →
Quick answer

BLVD Q is a 210-suite mid-rise under construction at 933–935 The Queensway in Etobicoke, built by Mattamy Homes with TACT Architecture as design architect and Mason Studio on interiors. Sales launched the week of 21 September 2023, ground was broken that autumn, and the tower crane went up in April 2025. Occupancy is targeted for 2027.

Mattamy describes it as 11 storeys. UrbanToronto’s project record says 10, at 43.05 m. I have not been able to reconcile those, so I am giving you both rather than picking one.

The building

Field What the record says
Address 933–935 The Queensway, Etobicoke, Toronto, ON M8Z 1P3
Developer Mattamy Homes — confirmed in Mattamy’s own press release of 21 September 2023
Design architect TACT Architecture
Architect of record Onespace Unlimited
Interior design Mason Studio
Landscape architect NAK Design Strategies
Storeys 11 per Mattamy; 10 per UrbanToronto, which records the height as 43.05 m. Unusually, it is the developer claiming the higher number here
Suites 210
Suite sizes Studios 359–420 sq ft; one-bedroom 513–560; two-bedroom 693–767; three-bedroom 904–965; penthouse 1,212 — all from Mattamy’s own floor-plan pages
Ceilings 9′0″
Retail Yes, at grade
Sales launch Week of 21 September 2023
Construction Ground broken autumn 2023; excavation complete and crane raised April 2025
Occupancy target 2027

It was going to be twice as tall

This site was first proposed in 2019 as a 16-storey building at 58.52 m. It was trimmed through the approvals process to what is being built now. UrbanToronto’s thread history tracks the change directly, from “58.52m | 16s” to the current mid-rise.

That is not an unusual outcome on The Queensway, and it is worth understanding if you are trying to read the street’s future. Toronto’s mid-rise performance standards tie permitted height to the width of the road right-of-way, and most of this corridor lands in mid-rise territory. The tall buildings you see proposed here — and there are several — are on large sites that went through their own site-specific policy fights, not on ordinary lots.

Amenities

Mattamy’s press release describes three floors of amenity space: co-working zones and independent workspaces, an event space with a cocktail lounge, and sixth-floor terraces holding fitness, children’s spaces, dining and lounge areas. The published amenity list also includes concierge, gym, media room, party room, pet spa, yoga studio and parcel storage.

TACT’s Mike Lock described the design approach as “Warm Modernism” — combining clean lines, warm materials and articulation of the building mass into smaller, more approachable pieces. Whatever you make of the phrase, the massing strategy it describes is the right one for a street of this width.

Careful with lookalike websites

There are several websites for this project that are not Mattamy’s. At least one, at a domain built around the project name, is an individual agent’s marketing site rather than the builder’s. Nothing wrong with an agent having a site — I have one — but if you are checking a figure, check it at mattamyhomes.com or Mattamy’s media room, not at a domain that merely looks official. The same caution applies to almost every pre-construction project on this street.

What a buyer should be asking

  • The outside occupancy date in the agreement, not the marketing year. 2027 is a target.
  • The deposit structure and what happens to your deposit if dates move. Mattamy does not publish this; you get it in the agreement.
  • Parking allocation and price, and whether it is available to your suite type at all.
  • Closing cost caps. Development charges, levies and utility connection fees on a pre-construction closing are where budgets get broken. Get them capped in writing.
  • Assignment rights and fees, if there is any chance you will not close yourself.
  • Your ten-day rescission right. Use it, with a lawyer.

My read

Of the pre-construction projects on this stretch, BLVD Q is the one where the shovels are demonstrably in the ground — the crane went up in April 2025 and the underground is being formed. That materially reduces the single biggest pre-construction risk, which is a project that never starts. It does not reduce the price risk. Compare the per-square-foot ask against what registered buildings on this street actually sell for before you decide it is good value.

Considering BLVD Q?

Send me the floor plan and the worksheet. I will tell you how the price compares to registered buildings a few doors away, what I would negotiate on closing costs, and which suite exposures I would avoid. My office is on this street, a short walk from the site.

connect@jatindua.com · 437-987-1925 · Book a free consultation

Confidential. Read personally and answered within 24 hours. I never share, sell or distribute your information.

Free tool — AI condo value estimator

Condo Valuation

What’s your condo
worth today?

Three quick steps. Condos don’t price like houses — your floor, your view, and whether you own parking move the number more than anything else. This weighs all of them.

01Your Building
02Your Unit
03Extras & Report

Where is the condo?

Building and area do most of the work. A Humber Bay tower and a Scarborough mid-rise are different markets entirely.

Please enter the building address or name.

Please choose the closest area.

Please choose the building age.

Tell me about your unit

Drag to your floor. In a Toronto tower each storey up is worth real money — and the view is worth more again.

Please choose your layout.

700 SQ FT
3003,000+
12
Ground
12FLOOR
160+

Mid-rise. Solid, but the premium really starts higher up.

Pick one

Extras, then your report

Parking is the single biggest add-on in a Toronto condo — in some buildings it’s worth more than a renovation.

Please choose the condition.

Please enter your name.

Please enter a valid email address.

Please enter a phone number.

No cost, no obligation.
Your details are never sold or shared.

Reading recent condo sales…

Estimated market value

$0$0

Most likely $0 · about $0 per square foot

What moved the number

Starting from what comparable units in your area sell for, here’s what your specifics added or subtracted.

Market context

Average condo sale, your area
Days on market

Two units, same floor plan,
$90,000 apart.

That happens constantly in condos — one has the parking, the right exposure, or a board that keeps the reserve fund healthy. A model can’t see your status certificate. I can.

How this works — your estimate comes from a model built on recent Toronto & GTA condo sale data, weighting area, size, layout, floor, exposure, view, parking, locker, age and condition. It is an automated estimate for information only — not an appraisal and not a Comparative Market Analysis. Condo values also depend on the building’s reserve fund, maintenance fees, recent special assessments and status certificate, none of which a model can read. Ask me for a written CMA before you make a decision.

Frequently asked questions

Who is building BLVD Q at 935 The Queensway?

Mattamy Homes. It confirmed the project in its own press release dated 21 September 2023. TACT Architecture is the design architect, Onespace Unlimited the architect of record, Mason Studio the interior designer and NAK Design Strategies the landscape architect.

How many storeys is BLVD Q?

The sources disagree. Mattamy’s own press release and project page say 11 storeys. UrbanToronto’s project database says 10 storeys at 43.05 metres. Both are given here because neither can be dismissed.

How many units are in BLVD Q?

210 suites, ranging from 359 sq ft studios to a 1,212 sq ft penthouse, with retail at grade.

Is BLVD Q under construction?

Yes. Ground was broken in autumn 2023, excavation is complete, and the tower crane was raised in April 2025 with forming underway on the underground levels. Occupancy is targeted for 2027.

Was BLVD Q originally going to be taller?

Yes. The site was first proposed in 2019 as a 16-storey building at 58.52 metres, and was reduced to the current mid-rise through the approvals process.

What amenities will BLVD Q have?

Mattamy describes three floors of amenity space, including co-working areas, an event space with cocktail lounge, and sixth-floor terraces with fitness, children’s spaces, dining and lounge areas. The published list also includes concierge, gym, media room, party room, pet spa, yoga studio and parcel storage.

Related reading

Sources

Every figure on this page traces to one of these. Checked 30 August 2026.

About the author — Jatin Dua, Etobicoke real estate agent

I’m a licensed Realtor with RE/MAX Quantum Realty at 799 The Queensway in Etobicoke. My office is on this street, which is the only reason I can write pages like this one: I walk past these sites, I read the City files, and I check the numbers against the source rather than repeating what a marketing page says. I work with buyers, sellers and investors across Stonegate–Queensway, Mimico, Humber Bay Shores, New Toronto, Long Branch and Alderwood.

Questions about a specific suite or a specific site? connect@jatindua.com or 437-987-1925.

Please read this. This page is general information for Ontario residents, not legal, tax, financial or investment advice, and it is not a substitute for a lawyer’s review of a status certificate or an accountant’s review of your numbers. Building, planning and market figures are drawn from the public sources listed above on the date shown and can change without notice; where those sources disagree with each other, I have said so rather than quietly picking a number. Development applications described here are proposals or approvals, not guarantees that anything will be built, and approved projects change. Always verify unit-specific facts — fees, parking, locker, exclusive-use areas, rules and any special assessment — against the condominium corporation’s own documents before you commit. Not intended to solicit buyers or sellers currently under contract with another brokerage. E. & O.E.

Call or text 437-987-1925
Scroll to Top

Contact Jatin

Please send your query and I will get back to you