Published 29 September 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty

CG Tower is the fifth and final residential tower of Cortel Group’s Expo City in the Vaughan Metropolitan Centre, at Jane Street and Highway 7. Cortel and the City of Vaughan list it at 60 storeys and 551 units, designed by BDP Quadrangle with a brick-clad precast facade, and Cortel says it welcomed its first residents in October 2024. The CTBUH database lists it as Vaughan’s tallest building at 189.8 metres. TRREB publishes no building prices; across Vaughan in August 2026, condo apartments sold at a median of $525,000 and an average of $607,650, at 96 percent of list price, with about 6.8 months of supply. A suite here should be priced from CG Tower’s own resales and the newest VMC towers.
CG Tower at a glance
| Fact | CG Tower (Expo 5) | Source |
|---|---|---|
| Location | Jane Street and Highway 7; project address 2900 Highway 7 | Cortel Group; CTBUH |
| Storeys | 60 (CTBUH’s floor count is 59) | Cortel Group; BDP; City of Vaughan; CTBUH |
| Units | 551 | City of Vaughan; CTBUH |
| Height | 189.8 m | CTBUH |
| Developer | Cortel Group | Cortel Group |
| Architect | BDP Quadrangle | CTBUH; BDP |
| Retail | 28,000 sq ft | City of Vaughan |
| First residents | October 2024 | Cortel Group (April 2025) |
| Status | Registered | Cortel Group |
| Condominium corporation no. | Not verified here; it appears on the status certificate | — |
Source notes: Cortel, BDP and the City of Vaughan all describe a 60-storey tower; the Council on Tall Buildings and Urban Habitat (CTBUH) counts 59 floors above ground and four below, and dates completion to 2024, while BDP’s project page gives 2025. CTBUH uses 2900 Highway 7, the same project address UrbanToronto uses for Expo City; confirm your unit’s legal address on title.
Where it sits and what is nearby
CG Tower completes the Expo City community that Cortel began with the VMC’s first two condo towers. The City of Vaughan describes a podium overlooking Edgeley Pond and Park, and BDP says the building is oriented toward the park and within walking distance of the subway and rapid bus transit.
- Neighbours. Expo City’s first two towers and the 39-storey Nord East and Nord West are next door.
- Subway. Vaughan Metropolitan Centre Station has been the terminus of Line 1 since 17 December 2017.
- Park. Edgeley Pond and Park is the City’s signature green space in this part of the VMC.
- Highways. Highways 400 and 407 meet at the VMC, which keeps the tower practical for owners who drive.
BDP lists retail at grade, an art gallery, underground parking and green roof terraces among the building’s features, and says the brick-embedded precast panels let crews enclose a full floor in a day. The red brick is meant, in Cortel’s words, as an homage to the area’s suburban homes. For how this tower compares with Transit City and Festival, see my Vaughan Metropolitan Centre condo buildings guide.
What TRREB’s August 2026 numbers say (Vaughan, not CG Tower)
TRREB does not publish prices for single buildings, and it does not report the Vaughan Metropolitan Centre as its own area. The closest official numbers are for the City of Vaughan as a whole, one municipality inside York Region. Treat them as the market your unit competes in, not as a price for CG Tower.
| Condo apartments, August 2026 | Vaughan | York Region | Markham | Richmond Hill | City of Toronto | All TRREB |
|---|---|---|---|---|---|---|
| Sales | 63 | 170 | 57 | 33 | 885 | 1,330 |
| Average price | $607,650 | $601,251 | $638,332 | $538,509 | $651,648 | $617,593 |
| Median price | $525,000 | $538,500 | $563,800 | $500,000 | $550,000 | $530,000 |
| New listings | 193 | 507 | 181 | 94 | 2,303 | 3,579 |
| Active listings | 431 | 1,098 | 356 | 197 | 4,938 | 7,882 |
| Months of inventory (calculated) | 6.8 | 6.5 | 6.2 | 6.0 | 5.6 | 5.9 |
| Sales to new listings (calculated) | 33% | 34% | 31% | 35% | 38% | 37% |
| Sale to list price | 96% | 97% | 97% | 95% | 96% | 96% |
| Avg. days on market | 41 | 44 | 40 | 47 | 39 | 41 |
Source: TRREB Market Watch, August 2026, condominium apartments. The calculated rows are my arithmetic: active listings divided by sales, and sales divided by new listings. These figures cover every condo apartment in the City of Vaughan, not one building and not only the VMC. One month of data is a snapshot, not a trend.
A tower that first welcomed residents in October 2024 has only a short resale record. Many of its suites were bought before construction, so an owner who wants to sell in 2026 is often competing with other first owners doing the same, as well as with new suites at Festival and Transit City 4 & 5. Vaughan’s 6.8 months of supply (my arithmetic) is the market-wide version of that point. A landmark address helps a listing get noticed; it does not let a suite ignore its comparables.
What moves a unit’s value in a tower like this
- Height. In Vaughan’s tallest building, the top floors have views no other VMC tower can offer. That is a genuine premium, but it needs sales of high-floor suites to prove it.
- Terraces. BDP designed cantilevered boxes that create large terraces. A suite with one of those terraces is a different product from a suite with a standard balcony; confirm its status in the declaration.
- Outlook. Suites facing Edgeley Pond and Park versus suites facing Highway 7 or a neighbouring tower. See choosing condo exposure.
- Layout. Price per usable square foot, whether the den has a door, and whether bedrooms are split.
- Parking and locker. CTBUH lists 564 parking spaces for 551 apartments; whether your suite has one is still a value point.
- First-year fees. Fees in a new building are set from the developer’s budget. See do high maintenance fees lower my condo value.
What to check in the status certificate and reserve fund study
Every resale condo in Ontario comes with the right to a status certificate. Under section 76 of the Condominium Act, the corporation must deliver it within 10 days of a request, and the fee is capped at $100, according to the Condominium Authority of Ontario. The corporation must also have a reserve fund study done at least every three years. These two documents tell a buyer more about the building than any listing.
- The common expense fee for the unit, and whether any increase has been announced for the coming budget year.
- The reserve fund balance and whether the corporation is following the funding plan from its latest study.
- Special assessments, levied or planned. A special assessment that is already decided usually stays with the seller unless the offer says otherwise; check the wording with your lawyer.
- Legal actions the corporation is part of, and any known deficiencies.
- Rules and by-laws on short-term rentals, pets, move-in bookings and renovations.
- The exact parking and locker units that go with the suite, and whether they are owned or exclusive-use common elements.
Because CG Tower is so new, ask the property manager whether the corporation has completed its first reserve fund study, and whether the current budget reflects actual running costs yet. Ask about any warranty or deficiency items the board is pursuing with the developer, and about any shared costs with the earlier Expo City towers.
Have your lawyer read the certificate before your condition date. I read the budget and the reserve fund pages myself because that is where surprises hide.
Selling or buying here: how to price a unit
- Any resales of the same layout in CG Tower, adjusted for floor and outlook.
- Assignment and first resales in other new VMC towers of similar size, especially Festival and Transit City 4 & 5.
- Nord East and Nord West, for the same developer and location, adjusted for age and height.
- Current listings in all of these, at the same size.
If there are no usable same-building sales, read how to price a condo when nothing in your building has sold, which walks through exactly this situation. To check an online number, see whether an online condo estimate is accurate.
Two tools help here: the AI condo value estimator below gives you a range in about a minute, and the net proceeds calculator turns any price into what actually lands in your account.
Where I fit
I work with condo buyers and sellers across Toronto and the whole GTA, including Vaughan, and I price a unit in CG Tower from the sales and listings that actually compete with it. When you have your estimator range, book a call or phone 833-330-1925 and we can go through it together.
Free tool — AI condo value estimator
Condo Valuation
What’s your condo
worth today?
Three quick steps. Condos don’t price like houses — your floor, your view, and whether you own parking move the number more than anything else. This weighs all of them.
Reading recent condo sales…
Estimated market value
—
$0–$0
Most likely $0 · about $0 per square foot
What moved the number
Starting from what comparable units in your area sell for, here’s what your specifics added or subtracted.
Market context
—
—
Two units, same floor plan,
$90,000 apart.
That happens constantly in condos — one has the parking, the right exposure, or a board that keeps the reserve fund healthy. A model can’t see your status certificate. I can.
Frequently asked questions
How tall is CG Tower in Vaughan?
Cortel Group, BDP and the City of Vaughan describe CG Tower as 60 storeys. The Council on Tall Buildings and Urban Habitat lists it at 189.8 metres and 59 floors above ground, and ranks it the tallest building in Vaughan.
How many units are in CG Tower?
The City of Vaughan and the CTBUH database both list 551 units. CTBUH also lists 564 parking spaces and four floors below ground.
When did CG Tower open?
Cortel Group says CG Tower welcomed its first residents in October 2024. CTBUH dates completion to 2024, and Cortel now lists the project as registered.
Who designed CG Tower Vaughan?
BDP Quadrangle designed CG Tower for Cortel Group. BDP describes brick-embedded precast panels, cantilevered boxes that form large terraces, and a transparent podium facing Edgeley Pond and Park.
Is CG Tower part of Expo City?
Yes. Cortel describes CG Tower as the fifth and final residential tower of Expo City, after Expo 1 and 2 and Nord East and West.
What is a condo in CG Tower worth?
TRREB does not publish building prices. Vaughan’s August 2026 condo median was $525,000. A CG Tower suite’s value depends on its floor, terrace, outlook and parking, measured against resales in this tower and other new VMC buildings.
Sources
- Cortel Group — CG Tower — fifth and final Expo City tower; registered
- Cortel Group — The future of urban living in Vaughan (April 2025) — first residents October 2024
- CTBUH Skyscraper Center — CG Tower — 2900 Highway 7, 551 apartments
- BDP Quadrangle — Expo 5, CG Tower — 60 storeys, brick precast facade
- City of Vaughan — CG Tower by Cortel Group — 551 units, 28,000 sq ft retail
- TTC — TTC officially opens Line 1 Extension — opened to the public 17 December 2017
- TRREB — Market Watch, August 2026 — condominium apartment tables by region and municipality
- Condominium Authority of Ontario — Status certificates — 10 days, up to $100, Condominium Act s. 76
- Condominium Authority of Ontario — Reserve funds and reserve fund studies — studies at least every three years
- Condominium Authority of Ontario — Special assessments
- CMHC — Calculating GDS / TDS — 50% of condominium fees counted; 39% / 44% limits
Related reading
- Vaughan Metropolitan Centre condo buildings guide
- Expo City condos, Vaughan: guide
- Festival condos, Vaughan: guide
- Transit City 4 & 5: guide
- How much is my condo worth in Vaughan?
- How to price a condo when nothing in your building has sold
- How floor, view and parking change a condo's value
About the author — Jatin Dua, Toronto and GTA real estate broker
I am Jatin Dua, Broker of Record and co-founder of RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway, Toronto. I work with buyers and sellers across Toronto and the GTA and have helped more than 100 families sell. Four-plus years of active GTA transactions and over $100 million in sales volume. Every figure here comes from a published table, regulator or statute linked in the sources, so you can check all of it without asking me.
Reach me at connect@jatindua.com or 833-330-1925, or book a call.

