Pre-Construction Homes and Condos in Downtown Toronto (2027): Projects, Prices and Deposits

Published 2 November 2026 · By Jatin Dua, Broker of Record, RE/MAX Quantum Realty

What's Your Unit Worth Right Now?

Get a free AI-powered price range for your condo in under 90 seconds — floor, exposure, view, parking and locker included. No name or address required.

Get My Free Estimate →
Glass condo tower under construction with a crane among downtown Toronto high-rises (illustrative)

By Jatin Dua · Broker of Record, RE/MAX Quantum Realty · Updated 2 November 2026 · 11 min read — Downtown Toronto pre-construction in 2027: towers building now, new vs resale prices, development charge cuts, deposits and HST rebates.

Short answer

Downtown Toronto pre-construction in 2027 is mostly condos in towers already being built, such as Alias, Concord Sky, QueenChurch and Pinnacle Lakeside, plus finished suites builders still hold. Few projects are launching. Resale condo apartment medians from January to October 2026 were $600,000 in C01 and $565,000 in C08. Deposit schedules are rarely published, so get yours in writing.

This guide is for buyers looking at a new condo in downtown Toronto for 2027, whether as a first home, a pied-a-terre or a rental. You will get the downtown towers in the public record and where each one stands, how new prices compare with downtown resale, how Toronto’s 2026 development charge cuts change the maths, and the costs to plan for before you sign.

What does downtown Toronto pre-construction look like going into 2027?

Downtown pre-construction is almost all condos, and in 2027 it mostly means towers that launched years ago and are now being built or finishing. Very little is launching. Urbanation counted only 60 pre-construction condo sales across the Greater Toronto and Hamilton Area in the third quarter of 2026, down 61% from a year earlier. Of the 760 new condos sold that quarter, 85% were in finished buildings.

Two other numbers from the same report matter for downtown buyers:

  • 5,127 new condos were finished but unsold across the region, about four times the level of two years earlier. Builders holding these suites have a reason to negotiate.
  • Investment groups bought 339 new suites in bulk at an average of $763 per square foot, which Urbanation says was about 40% below the original prices in the same buildings.

In plain terms, downtown buyers in 2027 can choose between remaining suites in towers under construction, finished new suites that builders still hold, assignments from earlier buyers, and resale. Each has a different price and risk.

Which downtown Toronto condo projects are selling or building now?

These are downtown projects I could confirm in UrbanToronto’s coverage and project database. Where I have a project page, I link it, and each page has a form for the current price list. Status is as last reported.

Project Builder Size Price from Deposit Est. occupancy Status (as reported)
Alias, Church and Richmond Madison Group 48 storeys, 592 condos Price list on request Not published Not published Facade in final stages, public realm work started (Aug 2026)
Concord Sky, 383 Yonge St Concord Adex 85 storeys, 1,407 units Price list on request Not published Not published Under construction
QueenChurch, Queen and Church Tridel and Bazis 57 storeys, 443 condos Price list on request Not published Not published Podium rising above heritage facades (Sept 2026)
Pinnacle Lakeside phase 1, Lake Shore Blvd E and Sherbourne Pinnacle International 44- and 54-storey condo towers, 1,261 condos, plus a rental building Price list on request Not published Not published Towers rising (June 2026)
The Goode, 33 Parliament St Graywood Developments 32 storeys, 557 units Price list on request Not published Occupancy began Occupancy began (Jan 2026)
No. 31 Condos, 31 Parliament St Lanterra and Westdale 46 storeys, 467 units Price list on request Not published Not published 41 storeys reached by Dec 2025
101 Spadina, Spadina and Oxley Devron Developments 50 storeys, 452 units Price list on request Not published Not published Pre-construction
River and Fifth, 5 Defries St Broccolini 37 storeys, 580 units Resale and any remaining units Not applicable Built Listed as complete
Pinnacle Lakeside phase 2 Pinnacle International Revised plan for 60- and 70-storey towers, 1,390 units Not applicable Not applicable Not applicable Application stage (2026)

Source: UrbanToronto (9 Jan, 22 June, 11 Aug and 24 Sept 2026) and UrbanToronto project database (checked Nov 2026). Builders did not publish prices, deposits or occupancy dates in these reports.

Notice the pattern. Most of these towers sold years ago, so what is available is often a handful of remaining suites, finished inventory or assignments from earlier buyers. Always ask which one you are being offered, because the price, deposit and closing timeline differ for each.

Where is downtown Toronto growing next?

  • The waterfront east of Yonge. UrbanToronto’s November 2026 look back at East Bayfront shows more than a decade of towers along Queens Quay East, with Pinnacle Lakeside rising and new land being created at Parliament Slip.
  • The Yonge and Church corridors. Concord Sky, Alias and QueenChurch show how much height is now going into the blocks between Yonge and Jarvis.
  • Transit. The Ontario Line will add a new downtown subway, but it has no confirmed opening date, with service expected in the early 2030s. Line 5 Eglinton opened in February 2026, but it runs through midtown, not downtown.

For downtown buyers, the point is that supply keeps coming. New towers compete with finished buildings next door, which keeps a lid on resale prices for ordinary one-bedrooms. My downtown Toronto condo market outlook for 2027 covers prices and rents in more detail.

If you want the current price list, floor plans and incentives for downtown Toronto projects, send me a note below and I will send what I have.

Get the price list and floor plans

Tell me which project or area you are looking at. I will send the current price list, available floor plans, the deposit structure and the incentives on offer, plus my honest read on whether it is worth it.

This goes straight to me, not a call centre. No spam, and I never sell your details.

Got it, thank you.
I will send what I have on it personally, usually the same day.

Is a new downtown condo cheaper than resale?

Usually not. Here is what resale homes sold for in the two TRREB districts that make up most of downtown: C01 (west of Yonge, including the Entertainment District, King West, CityPlace and the waterfront) and C08 (east of Yonge, including St. Lawrence, Corktown, Regent Park and the Distillery area).

Resale median, Jan to Oct 2026 C01 Change vs 2025 C08 Change vs 2025
Condo apartment $600,000 -6.6% $565,000 -7.4%
Condo townhouse $868,750 -5.6% $845,000 -12.9%
Freehold townhouse $1,275,000 -6.2% $1,150,000 -14.8%
Condo apartment sales 2,138 – 1,257 –
Condo apartment avg. days on market 37 – 38 –

Source: TRREB MLS data via REALM, January to October 2026 vs the same period of 2025. Toronto districts C01 and C08, resale only, median sold prices. District figures, not building figures.

Urbanation’s per-square-foot figures show the gap. Finished but unsold new condos across the region were asking $1,157 per square foot on average in the third quarter of 2026, while resale condos in the former City of Toronto averaged $905 per square foot. Those are different areas and different products, but the message is clear: you pay a premium for new. Make sure you are getting something for it, such as a full Tarion warranty, a better layout or HST relief you qualify for. To see what a comparable resale suite is worth, try my downtown Toronto condo value guide.

How much do Toronto’s 2026 development charge cuts save on a new condo?

Development charges are fees the City charges builders for growth costs, and they are built into new home prices. In 2026, Canada and Ontario agreed to give Toronto $1.5 billion over ten years so the City could cut residential charges for about 40 months.

Ownership home type (per unit) Regular City charge Cut Reduced charge
Apartment, studio or one-bedroom $52,676 40% $31,606
Apartment, two bedrooms or more $80,690 60% $32,276
Townhouse or multiple, two bedrooms or more $113,938 60% $45,575
Single or semi-detached $137,846 60% $55,138

Source: City of Toronto, report on implementing the Development Charges Reduction Program (22 July 2026). Non-rental rates shown; rental rates are lower.

The catch for buyers is timing. The cut applies only to developments that had no building permit before 30 March 2026 and get their first permit during the program. Every tower in the table above was already under construction or finished, so none of them is likely to qualify. The savings, if passed on, will show up in launches from 2026 onward. The City report does not say builders must pass the savings to buyers, so ask.

What deposit structure do downtown condo builders ask for?

None of the downtown projects above published a deposit schedule in the reports I used, so I will not guess one. For any downtown condo, check:

  • The schedule by date, and whether you can pay it without touching your closing money. My deposit calculator lays it out.
  • The protection. Tarion covers new condo deposits up to $20,000, and the Condominium Act requires the rest to be held in trust or otherwise secured. My guide to Tarion coverage on pre-construction condos explains the rest.
  • The 10-day cooling-off period on new condos. Use it to have a lawyer read the agreement and the disclosure statement.

What costs come on top of the price downtown?

  • HST and the 2027 rebates. For agreements signed from 1 April 2026 to 31 March 2027, Ontario’s enhanced new housing rebate and New Home Affordability Payment can together cover up to $130,000 of HST on a home you or a relative will live in, subject to eligibility. Assignments and investor purchases are treated differently, so get advice.
  • Two land transfer taxes. Inside Toronto you pay both the Ontario and the Toronto tax. Eligible first-time buyers can get up to $4,000 back from Ontario and up to $4,475 from the City.
  • Interim occupancy. Downtown towers often have months between moving in and final closing, when you pay a monthly occupancy fee that builds no equity. See my interim occupancy guide.
  • Closing adjustments such as Tarion enrolment, the HCRA fee, utility meters and levies, plus any development charge increase your agreement passes on.

Who should buy pre-construction downtown in 2027?

First-time buyers under $1 million. A one-bedroom or one-plus-den is within reach, and buying a finished new suite from a builder lets you see it first and close sooner. If you sign by 31 March 2027 and live there, HST relief can help.

Families. Downtown new condos skew small. Two- and three-bedroom suites exist but are scarce, and freehold new builds downtown are rare. Compare carefully with resale townhouses.

Investors. The bulk sales at 40% below original prices tell you where the floor has been. Read my view on whether a Toronto pre-construction condo is a good investment in 2027 before you buy.

Downsizers. A finished or nearly finished building with a firm date gives you certainty that a new launch cannot.

Watch out

If you are buying an assignment in a tower that launched in 2021 or 2022, the original price may be well above what the suite will appraise for at closing, because downtown condo apartment medians are down about 12% to 14% from 2024. Your lender lends on the appraisal, not the price, so the gap comes from your cash. Read my guides on what to do if you cannot close a pre-construction condo and on assignment sales before you sign or sell.

My take

My view, not a forecast: downtown in 2027 rewards buyers who negotiate. I would look first at finished new suites that builders still hold and at towers close to completion, where you can inspect the product and the closing is near. I would only buy a new launch if its price clearly reflects the development charge cuts and beats nearby resale on a like-for-like basis.

What to do next

  1. Decide on the suite size you need and set a budget against the C01 and C08 resale medians above.
  2. Open the project pages linked in the table, or use the form above, to get current price lists, floor plans and incentives.
  3. Ask whether each offer is a remaining suite, finished inventory or an assignment, and run the deposit schedule through the deposit calculator.
  4. Work through my check before you sign list and use the 10-day cooling-off period for a lawyer’s review.
  5. Compare your pick with two or three resale suites nearby. The form above comes straight to me if you want help.

Need help with this? Talk to me.

I’m Jatin Dua, Broker of Record at RE/MAX Quantum Realty, and I’m the best agent to do this kind of work for you in Toronto and across the GTA. Over $100 million in GTA sales and 100+ families helped sell. Feel free to contact me any time: call or text 833-330-1925 or email [email protected].

Frequently asked questions

Are there new pre-construction condos in downtown Toronto in 2027?

Yes, but few new launches. Most downtown Toronto pre-construction available in 2027 is in towers already under construction, such as Alias, Concord Sky, QueenChurch and Pinnacle Lakeside, or in finished buildings with unsold suites. Urbanation counted just 60 pre-construction condo sales across the GTHA in the third quarter of 2026, a sign of how few launches there are.

How much is a pre-construction condo in downtown Toronto?

Builders rarely publish downtown Toronto prices in news reports, so ask for the current list. As a benchmark, finished but unsold new condos across the GTHA asked an average of $1,157 per square foot in Q3 2026, while resale condos in the former City of Toronto averaged $905. Downtown resale condo apartment medians were $600,000 in C01 and $565,000 in C08.

Is it cheaper to buy a new condo or a resale condo downtown?

Resale is usually cheaper per square foot in downtown Toronto in 2027. Urbanation’s Q3 2026 figures put finished new condos at $1,157 per square foot across the GTHA against $905 for resale in the former City of Toronto. A new condo can still make sense if you qualify for HST relief and value a full Tarion warranty.

Did Toronto cut development charges for new condos?

Yes. Under the Development Charges Reduction Program, funded with $1.5 billion from Canada and Ontario, Toronto cut residential charges by 40% for studio and one-bedroom units and 60% for larger units, retroactive to 30 March 2026, for about 40 months. Only developments with no building permit before that date qualify, so most towers under construction will not.

What deposit do I need for a downtown Toronto pre-construction condo?

It varies by project, and the downtown Toronto reports I used did not publish deposit schedules. Ask for the full schedule before you sign. Tarion protects new condo deposits up to $20,000, and the Condominium Act requires the rest to be held in trust or otherwise secured. You also get a 10-day cooling-off period.

Can I get the HST rebate on a downtown Toronto condo?

Possibly, if you sign with the builder between 1 April 2026 and 31 March 2027 and you or a relative will live in the condo. Ontario’s enhanced rebate and New Home Affordability Payment can cover up to $130,000 of HST, subject to eligibility. Investors and assignment buyers are treated differently, so confirm with a lawyer.

Is a downtown Toronto pre-construction condo a good investment in 2027?

It is risky in 2027. Downtown Toronto condo apartment medians fell about 7% in 2026, finished unsold new condos across the region hit 5,127 units, and investors bought bulk suites at about 40% below original prices. A downtown condo can still suit a long-term buyer whose numbers work at today’s rents.

What is interim occupancy on a downtown Toronto condo?

Interim occupancy is the period when you move into a new downtown Toronto condo before the building is registered and you get title. During it you pay the builder a monthly occupancy fee that covers estimated interest, taxes and common expenses, but it builds no equity. In large towers it can last several months.

When will the Ontario Line open in downtown Toronto?

There is no confirmed opening date, with service expected in the early 2030s. The Ontario Line will add a new subway through downtown Toronto. Do not pay a premium for a downtown condo today based on a future Ontario Line station, because timelines for large transit projects often move.

Sources

Related reading

About the author — Jatin Dua, Toronto and GTA real estate broker

I am Jatin Dua, Broker of Record and co-founder of RE/MAX Quantum Realty Inc., Brokerage, Unit 101, 799 The Queensway, Toronto. I work with buyers and sellers across Toronto and the GTA and have helped more than 100 families sell. Four-plus years of active GTA transactions and over $100 million in sales volume.

Reach me at [email protected] or 833-330-1925, or book a call.

Please read this. General information current as at 2 November 2026. It is not legal, tax, accounting, mortgage or financial advice. I am a registered real estate broker, not a lawyer, accountant or mortgage agent. Market figures are TRREB MLS data accessed through REALM or come from the sources linked above; they describe past sales and are not a forecast. Rules, rates and programs change, so confirm details with the official source or a licensed professional before you rely on them.