
What's Your Unit Worth Right Now?
Get a free AI-powered price range for your condo in under 90 seconds — floor, exposure, view, parking and locker included. No name or address required.
Get My Free Estimate →There are fourteen completed condominium buildings addressed on The Queensway in Etobicoke, holding roughly 2,090 homes between them. The oldest registered in 1999. The newest — Verge East — registered on 8 January 2026.
This page lists all of them with the figures I can verify, links my full guide to each, and separates what is finished from what is merely approved. If you are trying to work out what actually exists on this street as opposed to what is being marketed, start here.
The completed buildings
Sorted by address, west to east. “Registered” is the date the condominium corporation came into existence, which is when owners take title and start paying fees.
| Building | Address | Registered | Storeys | Suites | Corporation |
|---|---|---|---|---|---|
| The Tailor Residences | 1195 & 1197 | 21 Sep 2023 | 10–11 | 142 | TSCC-2996 |
| IQ Condos, Phase 1 | 1185 | 12 Jan 2015 | 12 | 123 | TSCC-2422 |
| 1156 The Queensway | 1156 | under construction | 12 | 220 | — |
| Loggia II | 1050 | 12 Jun 2008 | 9 | 142 | TSCC-1944 |
| Loggia | 1040 | 9 Jan 2008 | 10 | 174 | TSCC-1906 |
| Verge, west building | 1037 | see note | 10 (with 8-storey wing) | 203 | not verified |
| Verge, east building | 1007 | 8 Jan 2026 | 17 (with 10-storey wing) | 341 | TSCC-3160 |
| BLVD Q | 933–935 | under construction | 10–11 | 210 | — |
| The Hive Lofts | 892 | 2014 | 6 | 18 | not verified |
| Kazmir Condos | 880 | 2025 | 8 | 103 | not verified |
| 859 West | 859 | 2024 | 11 | 186–187 | TSCC-3049 |
| Curio Condos | 801 | 2025 | 10 | 206 | not verified |
| Queensway Park | 784 (and 7 Smith Cres) | 25 Aug 2022 | 9 | 170 | TSCC-2934 |
| Qube Condos | 760 | 29 May 2015 | 8 | 74 | TSCC-2454 |
| 700 The Queensway townhomes | 694–700 | 21 Sep 1999 | 2 | 8 | MTCC-1269 |
| Reina Condos | 689 (and 148–150 Wesley St) | 23 Dec 2025 | 9 | 200 | TSCC-3158 |
The roughly 2,090 figure is my own arithmetic on the suite counts in this table, not an official statistic. Where two sources give different counts I have shown the range. Where I could not verify a corporation number from a registry source, the cell says so rather than guessing — get those from a title search or the Condominium Authority of Ontario.
Buildings people think are on The Queensway, but are not
This trips up buyers constantly, so it is worth being explicit.
- Park Towers at IQ is at 15 and 17 Zorra Street, registered 1 March 2018, 24 storeys. IQ3 is at 45 Zorra Street, 42 storeys. Both are part of the IQ community and both are addressed on Zorra, not The Queensway.
- There is no building at 1201 The Queensway. 1195 and 1197 is The Tailor. I have looked for 1201 in the City’s application register and in the listing databases and it does not exist.
- Humber Bay Shores is a different market entirely, on Lake Shore Boulevard West and Marine Parade Drive. I have written about how the two compare, because the choice between them comes up in almost every conversation I have on this street.
What is coming, and what is only proposed
Under construction now: BLVD Q at 935 and 1156 The Queensway. Selling but not started: Joya at 1045–1049 and Maxium at 875.
Beyond those, the corridor carries several very large approved and proposed masterplans — the Cineplex site at 1025 alone is approved for 4,077 units. The full pipeline is set out here, with each City file number and its actual status, because “proposed” and “approved” are being used interchangeably in marketing and they are nothing like the same thing.
How to use this list
Two practical suggestions. First, if you are comparing buildings, compare suite count and age before you compare anything else — those two facts drive maintenance fees, board quality and reserve adequacy more than any amenity list. Second, before you make an offer in any of them, get the corporation number, pull the status certificate, and have a lawyer read it inside the ten-day window your agreement gives you.
Looking outside this street? The Etobicoke condo directory covers 258 documented buildings across the borough by name, street and corporation number.
Not sure which building is right for you?
Tell me your budget, your must-haves and whether you are buying to live in or to hold. I will shortlist the buildings on this street that actually fit, tell you which ones I would avoid and why, and pull the recent sales in each. My office is at 799 The Queensway, so this is genuinely my own street.
connect@jatindua.com · 437-987-1925 · Book a free consultation
Confidential. Read personally and answered within 24 hours. I never share, sell or distribute your information.
Free tool — AI condo value estimator
Condo Valuation
What’s your condo
worth today?
Three quick steps. Condos don’t price like houses — your floor, your view, and whether you own parking move the number more than anything else. This weighs all of them.
Reading recent condo sales…
Estimated market value
—
$0–$0
Most likely $0 · about $0 per square foot
What moved the number
Starting from what comparable units in your area sell for, here’s what your specifics added or subtracted.
Market context
—
—
Two units, same floor plan,
$90,000 apart.
That happens constantly in condos — one has the parking, the right exposure, or a board that keeps the reserve fund healthy. A model can’t see your status certificate. I can.
Frequently asked questions
How many condo buildings are on The Queensway in Etobicoke?
Fourteen completed condominium buildings are addressed on The Queensway, holding roughly 2,090 homes between them, plus two more currently under construction. The oldest registered in 1999 and the newest, Verge East, registered on 8 January 2026.
What is the newest condo building on The Queensway?
Verge East at 1007 The Queensway, registered as TSCC-3160 on 8 January 2026, with 341 suites. Reina at 689 registered shortly before it, on 23 December 2025.
What is the oldest condo on The Queensway?
The townhome condominium at 694-700 The Queensway, registered as MTCC-1269 on 21 September 1999. The oldest apartment-style buildings are Loggia at 1040, registered January 2008, and Loggia II at 1050, registered June 2008.
Is there a condo at 1201 The Queensway?
No. 1195 and 1197 The Queensway is The Tailor Residences. There is no record of a building at 1201 in the City of Toronto development application register or in the listing databases.
Are Park Towers and IQ3 on The Queensway?
No. IQ Condos Phase 1 is at 1185 The Queensway, but Park Towers at IQ is addressed at 15 and 17 Zorra Street and IQ3 is at 45 Zorra Street. They are part of the same community but not on The Queensway.
How do I find a condo corporation number?
From a title search, or from the Condominium Authority of Ontario’s public registry. Where this page shows “not verified”, it means I could not confirm the number from a registry source and would rather leave it blank than publish something you might rely on.
Related reading
- What Queensway condos actually sold for
- The Queensway development pipeline in 2026
- Pre-construction on The Queensway compared
- Etobicoke condo directory — 258 buildings
- The M8Y and M8Z real estate guide
- Ontario real estate answers — 42 questions
Sources
Every figure on this page traces to one of these. Checked 30 August 2026.
- condos.ca — building profiles for The Queensway. Registration dates, corporation numbers, storeys, suite counts and property managers for the completed buildings on this street. Accessed 30 August 2026.
- UrbanToronto — project database. Independent project records used to cross-check storeys, unit counts, developers and architects. Accessed 30 August 2026.
- City of Toronto Open Data — Development Applications dataset. The City’s own machine-readable register of application file numbers, descriptions and statuses. Accessed 30 August 2026.
- City of Toronto — Application Information Centre. Free public search of development and condominium applications by address. Accessed 30 August 2026.
- Condominium Authority of Ontario. Ontario’s condominium regulator and the public registry of condominium corporations. Accessed 30 August 2026.
- Condominium Act, 1998, S.O. 1998, c. 19 (Ontario). The statute governing status certificates, including the ten-day delivery requirement and the prescribed maximum fee. Accessed 30 August 2026.
- City of Toronto — Verge draft plan of condominium files 25 144904 and 25 144958 WET 03 CD. The City records that confirm 1007 The Queensway at 341 units and 1037 The Queensway at 203 units. Accessed 30 August 2026.
About the author — Jatin Dua, Etobicoke real estate agent
I’m a licensed Realtor with RE/MAX Quantum Realty at 799 The Queensway in Etobicoke. My office is on this street, which is the only reason I can write pages like this one: I walk past these sites, I read the City files, and I check the numbers against the source rather than repeating what a marketing page says. I work with buyers, sellers and investors across Stonegate–Queensway, Mimico, Humber Bay Shores, New Toronto, Long Branch and Alderwood.
Questions about a specific suite or a specific site? connect@jatindua.com or 437-987-1925.
