RE/MAX Quantum RealtyContact

The Queensway, Etobicoke: the reference guide to the corridor

Flat vector illustration of The Queensway corridor in Etobicoke showing mid-rise and tower buildings along an arterial road with a streetcar, bus and bike track

Last updated 30 August 2026. Written by Jatin Dua, Broker of Record at RE/MAX Quantum Realty, 799 The Queensway, Etobicoke — My office is at 799 The Queensway, which is the only reason I can write a page like this one. Every figure below is sourced, dated and traceable to a primary source.

What's Your Unit Worth Right Now?

Get a free AI-powered price range for your condo in under 90 seconds — floor, exposure, view, parking and locker included. No name or address required.

Get My Free Estimate →
Quick answer

The Queensway is a major arterial road running from the Queen Street West, King Street West and Roncesvalles Avenue junction east of the Humber, west to Etobicoke Creek and the Mississauga boundary — address range 10 to 2225. It is Queen Street West, renamed, reportedly in 1941. It is a designated Avenue in the Official Plan with Mixed Use Areas designation, governed by an Avenue Study from 2003 that envisaged six to eight storeys — while current approvals run to 46 storeys, with 50 proposed. Six live applications carry an active Ontario Land Tribunal appeal. And no part of the street is within walking distance of Line 2: the nearest station from the Etobicoke stretch is roughly 2 to 2.5 kilometres in a straight line.

My office is at 799 The Queensway, so I have a reason to get this right that most people writing about the corridor do not. This page is the reference version: what the street actually is, who plans it, what is approved and appealed along it, what transit really serves it, and the seven things that get repeated about it that are wrong. Everything traces to a City of Toronto, Metrolinx, TTC or TRREB source, and where I could not verify something I say so instead of filling the gap.

What The Queensway actually is

The Queensway is a major arterial road running from the Queen Street West, King Street West and Roncesvalles Avenue junction in the east to Etobicoke Creek and the Mississauga boundary in the west. The City’s own street geometry gives the extent precisely: 95 centreline segments, address range 10 to 2225, east end at 43.63874, -79.44610 and west end at 43.60964, -79.56728.

It is Queen Street West, renamed. That is the whole explanation for most of the confusion around it: the street is one continuous axis, the name changes at Roncesvalles, and King Street West meets the same junction. The rename is reported to have happened in 1941, at Etobicoke Township’s initiative — though I could not find the by-law itself, so treat the year as reported rather than proven.

DetailSource
ClassificationMajor arterial. 94 of the City’s 95 centreline segments are coded major arterial; a City transportation report states it directly.Toronto Centreline; City staff report
ExtentQueen Street West / King Street West / Roncesvalles Avenue junction to Etobicoke CreekToronto Centreline
MunicipalityEntirely City of Toronto. The Etobicoke portion is in the former City of Etobicoke; east of the Humber it is in the former City of Toronto.Toronto Centreline; City bridge records
WardWard 3, Etobicoke-Lakeshore. It was Ward 5 before the 2018 boundary change, which is why older sources say Ward 5.City ward profile; development application records coded WARD_NUMBER 03
Community councilEtobicoke York. Planning items carry the prefix EY.City council records
A jurisdiction quirkNine centreline segments around the Highway 427 and QEW interchange are coded as provincial rather than City jurisdiction.Toronto Centreline
In MississaugaContinues as Queensway East and Queensway West, Peel Regional Road 20. The definite article is dropped.Secondary sources only — not verified against a Peel by-law

Lane count: I am not going to give you one. The City does not publish a lane count per segment in any dataset or report I could reach. Secondary sources describe four to six lanes west of South Kingsway. If a listing tells you the number of lanes outside your window, that number is unsourced.

How it is planned

This is the part that decides what gets built next to a unit you are thinking about buying, and it is genuinely more complicated than any marketing page will tell you.

It is an Avenue

City of Toronto planning staff, in the report on 801 The Queensway: the site “is identified on Map 2 — Urban Structure in the Official Plan as an Avenue”, and the lands are “designated Mixed Use Areas on Map 15 — Land Use Plan of the Official Plan.” Avenues are the corridors the City has designated for reurbanisation.

The Avenue Study is from 2003

The Queensway Avenue Study was completed and adopted in 2003 and implemented through Zoning By-law 514-2003, with accompanying design guidelines and streetscape improvements. Its vision, quoted in current City staff reports, was “six to eight storey mixed-use and mid-rise development with a density of three times the area of the lot.”

That vision is twenty-three years old and the corridor has left it behind. Current approvals and live applications on The Queensway run to 10, 12, 13, 14, 15, 18, 30, 35, 38, 40, 45, 46 and, in one proposal, 50 storeys. Quoting “six to eight storeys” as though it describes what may be built next door is technically sourced and badly misleading. I have not found any City page for a refreshed Queensway Avenue Study, and the corridor does not appear on the City’s active planning studies list.

The mid-rise rules, in plain terms

The Mid-Rise Building Design Guidelines were replaced on 5 December 2024. Two things in them matter to a buyer.

Height follows street width. The governing principle is that a mid-rise building’s height should generally be no greater than the width of the right-of-way it fronts. The City publishes a table:

Planned right-of-way widthMaximum heightStoreys
20 m20 m6
23 m23 m7
27 m27 m8
30 m30 m9
33 m33 m10
36 m or more36 m11

I could not retrieve the planned right-of-way width for The Queensway from Official Plan Map 3, so I am not going to tell you which row applies. Anyone quoting a storey figure for the corridor from this table without citing Map 3 is guessing.

The angular plane is gone. The old rule stepped buildings back along a 45-degree plane from the rear property line — the wedding-cake shape. The current standard is simpler: a 7.5 metre setback from the rear property line up to six storeys (20 metres), plus a further 2.5 metre step-back above 20 metres.

The as-of-right zoning trap

Zoning By-law 1260-2024, passed 14 November 2024, created as-of-right mid-rise permissions on Avenues. The City describes it as facilitating mid-rise development on Avenues “in areas without completed Avenue Studies”, and the supporting report lists exclusions for areas with conflicting Secondary Plans or Avenue Studies.

The Queensway has a completed Avenue Study. On the face of it the by-law therefore does not apply here — but I could not obtain the by-law’s schedule maps to confirm it parcel by parcel. If someone tells you The Queensway now has as-of-right mid-rise zoning, ask them which schedule. Verify it property by property before you rely on it.

Two other layers

Site and Area Specific Policy 432 applies to the lands known as 1025 The Queensway, established by Ontario Land Tribunal final order on 19 January 2023. It requires a minimum of 14,500 square metres of employment floor area with at least 51 per cent core employment uses, 75 affordable dwelling units, a minimum 2,500 square metres of non-residential floor area in the mixed-use portion, a block context plan, and a phasing strategy that sequences the employment and non-residential construction before or alongside the residential.

The Sherway Area Secondary Plan (OPA 469), adopted in October 2019 with further parts confirmed in force by the Ontario Land Tribunal effective 15 August 2023, covers a study area bounded by Highway 427, the CP rail corridor, Etobicoke Creek and the QEW. That geography implies it reaches the westernmost stretch of the corridor, but the City page does not state that Queensway frontage itself is inside the plan. Check OPA 469’s schedule map before assuming it applies to a specific property.

What is actually approved and appealed

From the City’s live development application register. Status values are the City’s own words. Where a staff report gives a different figure from the dataset, both are shown.

AddressProposalStatus
1025 (Cineplex site)Ten mixed-use buildings, 18 to 46 storeys, plus two 7-storey employment buildings. 4,222 units per the dataset, 4,077 per the May 2025 staff report. Central public park, three new public streets, a 929 sq m child care facility.Council approved, June 2025. Subdivision application under review.
1233–1255 (Kipling-Queensway Mall)Official Plan Amendment: six mixed-use blocks, roughly 500,000 sq m of floor area, two park blocks, new site-specific policies. The notice states density and heights are not part of this amendment.Council approved, June 2025.
1549–1551 + 76 FordhouseA 30-storey mixed-use building plus towers of 35, 40 and 45 storeys. 1,819 units, of which 342 affordable. Daycare, 1,322 sq m of parkland.Under appeal at the Ontario Land Tribunal.
125Redesignation to enable seven buildings, 12 to 50 storeys.Under appeal for non-decision, filed 30 October 2025. City staff recommend opposing it.
82915 storeys, roughly 332 units, minimum 590 sq m non-residential.Adopted by Council 4 February 2026; the by-law is withheld pending OLT-25-000221.
1361 / 1325Two towers of 46 and 35 storeys on an 11-storey base, with retail and a daycare.Zoning approved at the Tribunal 17 October 2023. Site plan under review.
123013 storeys, 175 purpose-built rental units, ground-floor retail.Under review — the newest application on the corridor, filed May 2026.
1045–1049 (Joya)12 storeys, 321 units, 715 sq m retail.Zoning approved. Site plan under review.
80110 storeys, 203 units.Final approval completed.
875 (Maxium)14 storeys, 183 units.Zoning appealed, OLT-21-001071. Final outcome not verified.
1061Three towers of 26, 34 and 43 storeys, 1,166 units.Long-standing appeal. Two 2023 site plan applications refused.
1750–1900Eight buildings, 6 to 38 storeys, 2,135 units, of which 200 affordable rental.Approved at the Board. Not built.
7228 storeys, 26 units. Prefabricated mass timber, no underground parking.Under review.

This corridor is unusually appeal-heavy. Of the applications that are not closed, six carry an active Ontario Land Tribunal or Board appeal status. That is a material fact if you are buying pre-construction here: an approval on paper and a building on the ground are separated, on this street, by years and sometimes by a tribunal. The two approvals that never became buildings are the cautionary example.

Transit, honestly

Route data below is taken from the TTC’s scheduled service feed rather than a printed map, and the distances are computed straight-line from station coordinates to the street centreline. They are not walking distances, which are longer.

What runs along the street

RouteTermini
80 Queensway (bus)80A Sherway Gardens to Keele Station; 80B Sherway Gardens to Mimico GO via Marine Parade; 80S short turn to Royal York
501 Queen (streetcar)Humber Loop to Neville Park
508 Lake Shore (streetcar, weekday peak)Humber to Distillery
507 Long BranchHumber to Long Branch — currently operating as a replacement bus in the schedule feed, not a streetcar
301 Queen (Blue Night)Overnight service

Crossing routes include 123 Sherway, 66 Prince Edward, 76 Royal York South, 77 Swansea, 110 Islington South, 44 and 944 Kipling South, 15 and 315 Evans, and 402 Parkdale.

Streetcars returned to Humber Loop on 29 October 2023 — the TTC described it as the first streetcar operation along The Queensway since January 2021.

The subway distance nobody states plainly

FromNearest Line 2 stationStraight-line distance
Queensway and Royal York (near 799)Royal York2,541 m
Queensway and IslingtonIslington2,709 m
Queensway and KiplingKipling2,215 m
Queensway and Park LawnOld Mill2,357 m

No part of The Queensway is within walking distance of Line 2. From the Etobicoke commercial stretch the nearest subway station is roughly 2 to 2.5 kilometres in a straight line, which is further on foot. The closest approach anywhere on the whole street is High Park Station at about 1,689 metres, and that is at the far eastern end, not in Etobicoke.

This is the corridor’s real trade-off and it is worth being straight about it. The bus service along the street is frequent and the GO options are genuinely good. The subway is a bus ride away, not a walk.

GO

StationStraight-line distance to the corridorLine
Mimico GO1,093 mLakeshore West
Kipling GO2,042 mMilton
Long Branch GO2,643 mLakeshore West

Metrolinx has Mimico GO station upgrades in procurement and design — a new east connection with elevator and stair access to all platforms, a new south tunnel entrance at Manchester and Blue Goose with elevator and stair connections, and accessibility work — as part of Lakeshore West GO Expansion. No completion date is published.

Park Lawn GO: do not count on it. Metrolinx’s Mimico page makes no mention of a Park Lawn station. A business case exists, but I could not confirm it is a funded, in-delivery project as at today. Separately, a Mimico GO redevelopment — a transit-oriented community, a different thing from the station upgrades — was reported cancelled. Those two are easy to conflate and are frequently conflated in listing copy.

The Complete Street

Council approved The Queensway Complete Street on 7 April 2022. From the Humber River to Burma Drive near Mimico Creek, it brings raised protected cycle tracks on both sides, level with the sidewalk and separated from the roadway by a curb; bike signals and protected corner islands; sidewalks widened to 2.1 metres where possible; a centre median to reduce left-turn collisions; improved bus stops; landscaping and stormwater features.

It is currently in detailed design, with construction anticipated in 2027, deferred behind bridge repairs.

It is not a road diet. The City states plainly that “the number of vehicle lanes will be maintained at current levels.” This gets misreported constantly, in both directions.

Parks and schools

Names and straight-line distances from the City’s own datasets. No rankings and no catchment claims — catchments are set by the school boards, they change, and a realtor asserting one is doing you no favours.

Parks on or immediately adjacent to the Etobicoke stretch: Jeff Healey Park (19 m), Queensway Park (61 m), Market Garden Mews (85 m), Senator Marian Maloney Park (120 m), Zorra Park (154 m), Saunders Crescent Parkette (164 m), Winslow-Dalesford Parkette (239 m), Dalesford Park (268 m), Queensland Park (414 m), Alan-Oxford Parkette (462 m), Grand Avenue Park (559 m), Bisset Park (561 m), Douglas Park (577 m), Berry Road Park (583 m). East of the Humber the corridor runs past South Humber Park, Humber Marshes and High Park.

New parkland is being secured through development: roughly 4,265 to 4,286 square metres at 1025, and 1,322 square metres at 1549–1551.

Schools within about 500 metres: St Louis Catholic Elementary (11 Morgan Avenue), Karen Kain School of the Arts (60 Berl Avenue), Garden Avenue Junior Public School (225 Garden Avenue), Mary Mother of God School (1515A Queen Street West). Between 500 and 900 metres: Etobicoke School of the Arts, Holy Angels Catholic Elementary, St Mark Catholic Elementary, Etienne Brule Junior School, Castlebar Junior School, George R Gauld Junior School, Fern Avenue Junior and Senior Public School, St Ambrose Catholic Elementary, Lanor Junior Middle School, Parkdale Collegiate Institute, St Vincent de Paul Catholic Elementary, Swansea Junior and Senior Public School, Parkdale Junior and Senior Public School.

Market data, with the caveat it needs

TRREB districtCoversRelationship to the corridor
W07Stonegate-QueenswayThe core Etobicoke stretch. This is the district a Queensway practice lives in.
W08Islington-City Centre West, Markland Wood, Etobicoke West Mall and othersThe corridor west of roughly Islington and Kipling
W01High Park-Swansea, Roncesvalles, South ParkdaleThe east end, east of the Humber
W06Alderwood, Long Branch, Mimico, New TorontoAdjacent, not on. W06 is south of the Gardiner and QEW. The Queensway is not in W06.

The most recent Toronto West community report I could retrieve is Q1 2025, which is roughly eighteen months old. Its W07 figures: average price $1,460,627, median $1,449,000, 137 new listings, 64 active, average sale-to-list 100 per cent, average 26 days on market.

Two reasons not to lean on those. They are stale. And the W07 condo apartment sample that quarter was one transaction — so the district average is dominated by low-rise resale, not by the condominium product that most of this corridor actually is. For current figures see the condo price page, and ask me for the live numbers rather than trusting any published quarterly average for a street this specific.

Seven things people get wrong about The Queensway

The claimWhat the primary source says
“It runs from the Humber River to the Mississauga border.”Wrong. The City centreline puts the east end at the Queen West, King West and Roncesvalles junction, about 2 km east of the Humber, and the City maintains a bridge carrying The Queensway over the Humber. The claim describes the Etobicoke neighbourhood called The Queensway, not the street.
“It is in Ward 5.”Out of date. Ward 3, Etobicoke-Lakeshore, since the 2018 boundary change.
“Sherway Gardens is on The Queensway.”Wrong. Sherway Gardens is at 25 The West Mall. It is near the west end and is the northern terminus of the 80 Queensway bus, but it does not front the street.
“The Queensway has as-of-right mid-rise zoning now.”Probably wrong. By-law 1260-2024 is described as applying to Avenues without completed Avenue Studies. The Queensway has one, from 2003.
“The planning framework allows six to eight storeys.”Technically sourced, badly misleading. That is the 2003 Avenue Study vision. Current approvals run to 46 storeys, with 50 proposed.
“The Complete Street will remove traffic lanes.”Wrong. The City: “The number of vehicle lanes will be maintained at current levels.”
“It is named after Queen Elizabeth II” or “after the QEW”.Neither. It is named for Queen Street, which it is a continuation of, reportedly in 1941. Elizabeth II acceded in 1952.

Every page I have written about this street

Thirty-six of them, organised by what you are actually trying to find out.

The buildings

What is being built

Getting around

Everyday life

Deciding

There is also a condo-focused overview of the corridor if that is what you came for, and the Etobicoke condo directory covers the buildings off The Queensway itself.

What I could not verify

Stated plainly, because a reference page that hides its gaps is not a reference page.

  • Lane count. No City source publishes one per segment.
  • The planned right-of-way width on Official Plan Map 3, which is what would let anyone state a defensible as-of-right height for the corridor.
  • Whether By-law 1260-2024 applies here. Needs the schedule maps.
  • Whether OPA 469 covers Queensway frontage. Needs the OPA schedule.
  • The outcome of the 875 The Queensway tribunal hearing scheduled for October 2022.
  • Park Lawn GO status. Not asserting it either way.
  • A 2026 TRREB Toronto West community report. Q1 2025 is the most recent I could retrieve.
  • The 1941 renaming by-law. Two secondary sources agree on the year; no primary record found.

The councillor for Ward 3 is worth checking at the source rather than trusting any page, including this one — a Toronto municipal election falls in October 2026.

Buying, selling or just trying to work out what happens next on this street?

I work this corridor from an office on it. If you want to know what is approved beside a specific building, what a specific tribunal appeal actually means for your view, or what a unit is genuinely worth against real comparables rather than a district average, send me the address. No obligation and no follow-up campaign.

connect@jatindua.com · 437-987-1925 · Book a free consultation

Confidential. Read personally and answered within 24 hours. I never share, sell or distribute your information.

Free tool — AI condo value estimator

Condo Valuation

What’s your condo
worth today?

Three quick steps. Condos don’t price like houses — your floor, your view, and whether you own parking move the number more than anything else. This weighs all of them.

01Your Building
02Your Unit
03Extras & Report

Where is the condo?

Building and area do most of the work. A Humber Bay tower and a Scarborough mid-rise are different markets entirely.

Please enter the building address or name.

Please choose the closest area.

Please choose the building age.

Tell me about your unit

Drag to your floor. In a Toronto tower each storey up is worth real money — and the view is worth more again.

Please choose your layout.

700 SQ FT
3003,000+
12
Ground
12FLOOR
160+

Mid-rise. Solid, but the premium really starts higher up.

Pick one

Extras, then your report

Parking is the single biggest add-on in a Toronto condo — in some buildings it’s worth more than a renovation.

Please choose the condition.

Please enter your name.

Please enter a valid email address.

Please enter a phone number.

No cost, no obligation.
Your details are never sold or shared.

Reading recent condo sales…

Estimated market value

$0$0

Most likely $0 · about $0 per square foot

What moved the number

Starting from what comparable units in your area sell for, here’s what your specifics added or subtracted.

Market context

Average condo sale, your area
Days on market

Two units, same floor plan,
$90,000 apart.

That happens constantly in condos — one has the parking, the right exposure, or a board that keeps the reserve fund healthy. A model can’t see your status certificate. I can.

How this works — your estimate comes from a model built on recent Toronto & GTA condo sale data, weighting area, size, layout, floor, exposure, view, parking, locker, age and condition. It is an automated estimate for information only — not an appraisal and not a Comparative Market Analysis. Condo values also depend on the building’s reserve fund, maintenance fees, recent special assessments and status certificate, none of which a model can read. Ask me for a written CMA before you make a decision.

Frequently asked questions

Where does The Queensway start and end?

It runs from the junction of Queen Street West, King Street West and Roncesvalles Avenue in the east to Etobicoke Creek and the Mississauga boundary in the west, with an address range of 10 to 2225, per the City of Toronto Centreline dataset. It crosses the Humber River rather than beginning there — the City maintains a bridge carrying The Queensway over the Humber.

Is The Queensway the same as Queen Street West?

It is the same continuous road, renamed. The name changes at the Roncesvalles junction, where King Street West also meets. The rename is reported to have happened in 1941 at Etobicoke Township’s initiative, though I could not locate the by-law itself.

How tall can buildings on The Queensway be?

The 2003 Queensway Avenue Study envisaged six to eight storeys at three times lot area, and that figure is still quoted in City staff reports. It no longer describes what is being approved: current approvals and live applications run to 10, 12, 13, 14, 15, 18, 30, 35, 38, 40, 45 and 46 storeys, with 50 proposed at 125 The Queensway. The mid-rise guidelines tie height to the planned right-of-way width, but I could not retrieve that width for The Queensway from Official Plan Map 3, so no defensible as-of-right figure can be stated.

How far is The Queensway from the subway?

Further than most listings suggest. Straight-line from the Etobicoke stretch to the nearest Line 2 station is roughly 2.2 to 2.5 kilometres — Royal York is about 2,541 m from Queensway and Royal York, Kipling about 2,215 m from Queensway and Kipling. Walking distances are longer. No part of the street is a walk to the subway. Mimico GO, on the Lakeshore West line, is closer at about 1,093 m.

Is The Queensway getting bike lanes?

Yes. The Queensway Complete Street was approved by Council on 7 April 2022 and brings raised protected cycle tracks on both sides from the Humber River to Burma Drive, along with widened sidewalks, a centre median and improved bus stops. It is in detailed design with construction anticipated in 2027. The City states the number of vehicle lanes will be maintained at current levels — it is not a road diet.

Which ward is The Queensway in?

Ward 3, Etobicoke-Lakeshore. It was Ward 5 before Toronto’s 2018 ward boundary change, which is why older pages still say Ward 5. Planning items go to Etobicoke York Community Council.

Which TRREB district is The Queensway in?

Mostly W07, Stonegate-Queensway, for the core Etobicoke stretch; W08 further west around Islington and Kipling; W01 at the east end past the Humber. It is not in W06 — that district is Alderwood, Long Branch, Mimico and New Toronto, south of the Gardiner and QEW.

Is Sherway Gardens on The Queensway?

No. Sherway Gardens is at 25 The West Mall. It is near the west end of the corridor and is the northern terminus of the 80 Queensway bus, but it does not front the street. Listing copy that places it “on” The Queensway is inaccurate.

How many condo buildings are on The Queensway?

I maintain individual pages for the buildings along the corridor, from 689 at the east end to 1195 in the west, plus a full directory. The number keeps moving because the corridor has a large pipeline: at the time of writing there are approvals or live applications at 125, 722, 801, 829, 875, 1025, 1045, 1061, 1230, 1233 to 1255, 1325, 1361, 1549 to 1551 and 1750 to 1900.

Related reading

Sources

Every figure on this page traces to one of these, and each was read on 30 August 2026. Primary sources only — statute, regulation, and the government or agency that administers the rule. Where I could not verify something from a primary source, the page says so instead of guessing.

About the author — Jatin Dua, Etobicoke real estate agent

I’m the Broker of Record at RE/MAX Quantum Realty, 799 The Queensway in Etobicoke. I write these pages the same way I work a file: read the primary source, quote it, date it, and say plainly where the source is silent or where two sources disagree. If a figure on this page has no citation beside it, that is a mistake and I want to hear about it.

I work with buyers, sellers, renters and investors across Etobicoke, Mimico, Humber Bay Shores, New Toronto, Long Branch, Alderwood and Stonegate–Queensway. connect@jatindua.com or 437-987-1925.

Please read this. This page is general information for Ontario residents. It is not legal, tax or financial advice, and it is not a substitute for a lawyer’s review of your agreement or an accountant’s review of your numbers. Every figure is drawn from the public sources listed above and was checked on 30 August 2026; legislation, rates, deadlines and government guidance change, sometimes without much notice, so verify anything you are about to rely on against the primary source before you act. Where sources conflict I have said so rather than quietly picking a number. Not intended to solicit buyers, sellers or tenants currently under contract or agreement with another brokerage. E. & O.E.
Call or text 437-987-1925
Scroll to Top

Contact Jatin

Please send your query and I will get back to you